Companies / Company / Hong Kong
HKSCC Nominees
HKSCC Nominees Ltd
香港中央结算(代理人)有限公司,
- Owned operating capacity
- 10.9 GW
- Operating plants
- 136
- In development
- 2.2 GW
- Countries
- 5
- Global rank
- #162
HKSCC Nominees is recorded by Global Energy Monitor as a company headquartered in Hong Kong. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 10.9 GW at 136 plants in 5 countries, ranking #162 of 13,356 owners on this site. 93% of that is coal, followed by gas (7%). Its largest holding is Shenhua Jiujiang power station in China, where its share of 15.2% equals 624 MW. The biggest part is held through China Shenhua Energy (about 8.9 GW). A further 2.2 GW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 11 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating10.9 GW58%
- Under construction695 MW4%
- Pre-construction591 MW3%
- Announced914 MW5%
- Shelved939 MW5%
- Retired431 MW2%
- Cancelled4.4 GW23%
Operating, by fuel
Operating, by country
Operating capacity by decade it started · average age 11 years
Map
136 operating plants with a stake held by HKSCC Nominees.
Compared with peers
Largest company owners in Hong Kong, by owned operating capacity.
Ownership structure
Who owns HKSCC Nominees, and what it owns.
Owned by
- Hong Kong Securities Clearing Company100%
Main chain to the top
- small shareholder(s) Unidentified ownersowns 93.8% of Hong Kong Exchanges and Clearing
- Hong Kong Exchanges and Clearing Companyowns 100% of Hong Kong Securities Clearing
- Hong Kong Securities Clearing Companyowns 100% of HKSCC Nominees
- HKSCC Nominees Company
Owns 12 companies
- China Shenhua Energy 58.5 GW operating15.2%
- PetroChina 6.4 GW operating11.4%
- China Energy Engineering 4.3 GW operating18.7%
- Huaneng Yunnan Diandong Energy 2.4 GW operating0%
- China Coal Pingshuo Group 1.0 GW operating0%
- Yanzhou Coal Mining 837 MW operating39%
- China Coal Huajin Group 600 MW operating0%
- Chongqing Rural Commercial Bank 220 MW operating22.1%
- BANK of Chongqing 151 MW operating33.8%
- China Petroleum & Chemical 93 MW operating19.6%
- Citic Securities 4.5 MW operating14.7%
- China Energy Shendong Coal Group17%
Power plants
152 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| Shenhua Jiujiang power stationJiangxi · indirect | China | Coal | Operating | 15.2% | 624 MW | 4.1 GW |
| Taishan power stationGuangdong · indirect | China | Coal | Operating | 12.2% | 612 MW | 5.0 GW |
| Shenhua Qingyuan power stationGuangdong · indirect | China | Coal | Operating | 11.3% | 452 MW | 4.0 GW |
| Jinjie power stationShaanxi · indirect | China | Coal | Operating | 10.6% | 396 MW | 3.7 GW |
| Beihai power stationGuangxi · indirect | China | Coal | Operating | 7.9% | 316 MW | 4.0 GW |
| Chongqing Wanzhou power stationChongqing · indirect | China | Coal | Operating | 15.2% | 304 MW | 2.0 GW |
| Luoyuan Bay power stationFujian · indirect | China | Coal | Operating | 15.2% | 304 MW | 2.0 GW |
| Guoneng Yueyang power stationHunan · indirect | China | Coal | Operating | 14.4% | 289 MW | 2.0 GW |
| Beilun power stationZhejiang · indirect | China | Coal | Operating | 3.8% | 270 MW | 7.1 GW |
| Shenhua Yongzhou power stationHunan · indirect | China | Coal | Operating | 12.2% | 255 MW | 2.1 GW |
| Huizhou Cogen power stationGuangdong · indirect | China | Gas | Operating | 15.2% | 252 MW | 1.7 GW |
| CEEC Chongzuo power stationGuangxi · indirect | China | Coal | Operating | 18.7% | 247 MW | 1.3 GW |
| Hebei Cangdong power stationHebei · indirect | China | Coal | Operating | 7.8% | 247 MW | 3.2 GW |
| Shandong Luxi power stationShandong · indirect | China | Coal | Operating | 20.5% | 246 MW | 1.2 GW |
| Shenmu power stationShaanxi · indirect | China | Coal | Operating | 13.9% | 222 MW | 1.6 GW |
| Jawa-7 power stationJawa · indirect | Indonesia | Coal | Operating | 10.6% | 211 MW | 2.0 GW |
| Tianming power stationSichuan · indirect | China | Coal | Operating | 10% | 201 MW | 2.0 GW |
| Dingzhou power stationHebei · indirect | China | Coal | Operating | 6.2% | 196 MW | 3.2 GW |
| Guohua Shouguang power stationShandong · indirect | China | Coal | Operating | 9.1% | 182 MW | 2.0 GW |
| Ninghai power stationZhejiang · indirect | China | Coal | Operating | 3.9% | 173 MW | 4.5 GW |
| Jianbi power stationJiangsu · indirect | China | Coal | Operating | 6.5% | 172 MW | 2.7 GW |
| Suizhong power stationLiaoning · indirect | China | Coal | Operating | 4.5% | 171 MW | 3.8 GW |
| Fujian Hongshan power stationFujian · indirect | China | Coal | Operating | 4.8% | 155 MW | 3.2 GW |
| Changzhou power stationJiangsu · indirect | China | Coal | Operating | 4.5% | 145 MW | 3.3 GW |
| Fangchenggang Qisha power stationGuangxi · indirect | China | Coal | Operating | 5.6% | 145 MW | 2.6 GW |
| Shenhua Guohua Beijing Gas Thermal power stationBeijing · indirect | China | Gas | Operating | 15.2% | 145 MW | 951 MW |
| Shenhua Shengli power stationInner Mongolia · indirect | China | Coal | Operating | 10.1% | 133 MW | 1.3 GW |
| Guohua Xuzhou power stationJiangsu · indirect | China | Coal | Operating | 6.5% | 129 MW | 2.0 GW |
| Liupanshui Dawan Waste Coal power stationGuizhou · indirect | China | Coal | Operating | 18.7% | 123 MW | 660 MW |
| Jiangyou power stationSichuan · indirect | China | Coal | Operating | 9.4% | 119 MW | 1.3 GW |
| Taizhou power stationJiangsu · indirect | China | Coal | Operating | 2.8% | 110 MW | 4.0 GW |
| Daqing Oil Central power stationHeilongjiang · indirect | China | Coal | Operating | 11.4% | 103 MW | 900 MW |
| Datong-2 power stationShanxi · indirect | China | Coal | Operating | 3.1% | 98 MW | 3.1 GW |
| Luoyang Mengjin power stationHenan · indirect | China | Coal | Operating | 7.8% | 93 MW | 1.2 GW |
| Fugu Guojiawan power stationShaanxi · indirect | China | Coal | Operating | 15.2% | 91 MW | 600 MW |
| Baotou Olefins power stationInner Mongolia · indirect | China | Coal | Operating | 15.2% | 91 MW | 600 MW |
| Jurong power stationJiangsu · indirect | China | Coal | Operating | 2.3% | 91 MW | 4.0 GW |
| Salaqi power stationInner Mongolia · indirect | China | Coal | Operating | 15.2% | 91 MW | 600 MW |
| Anqing power stationAnhui · indirect | China | Coal | Operating | 3.3% | 87 MW | 2.6 GW |
| Shenhua Zhunneng power stationInner Mongolia · indirect | China | Coal | Operating | 8.8% | 84 MW | 960 MW |
| Hulunbuir Baorixile power stationInner Mongolia · indirect | China | Coal | Operating | 6.9% | 83 MW | 1.2 GW |
| Guangxi Luzhai power stationGuangxi · indirect | China | Coal | Operating | 10.6% | 74 MW | 700 MW |
| Jiaxing power stationZhejiang · indirect | China | Coal | Operating | 1.2% | 70 MW | 6.0 GW |
| Zheneng Yueqing power stationZhejiang · indirect | China | Coal | Operating | 1.5% | 69 MW | 4.5 GW |
| Huadian Zengcheng Gas Thermal power stationGuangdong · indirect | China | Gas | Operating | 5.1% | 68 MW | 1.3 GW |
| Anhui Bengbu power stationAnhui · indirect | China | Coal | Operating | 2.6% | 68 MW | 2.6 GW |
| Guohua Zhoushan power stationZhejiang · indirect | China | Coal | Operating | 3.3% | 65 MW | 2.0 GW |
| Chizhou Jiuhua power stationAnhui · indirect | China | Coal | Operating | 3.3% | 65 MW | 2.0 GW |
| Shenhua Guoneng Dajing power stationXinjiang · indirect | China | Coal | Operating | 4.8% | 64 MW | 1.3 GW |
| Shenhua Yili power stationInner Mongolia · indirect | China | Coal | Operating | 7.8% | 62 MW | 800 MW |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| Chongqing Wanzhou power stationPhase II Unit 3 | China | Coal | Under construction | — | 152 MW | 1.0 GW |
| Chongqing Wanzhou power stationPhase II Unit 4 | China | Coal | Under construction | — | 152 MW | 1.0 GW |
| Liupanshui Dawan Waste Coal power stationUnit 2 | China | Coal | Under construction | 2025 | 123 MW | 660 MW |
| Hebei Cangdong power stationPhase III Unit 6 | China | Coal | Under construction | 2025 | 51 MW | 660 MW |
| Dingzhou power stationPhase III Unit 6 | China | Coal | Under construction | — | 41 MW | 660 MW |
| Anqing power stationPhase III Unit 6 | China | Coal | Under construction | — | 33 MW | 1.0 GW |
| Anqing power stationPhase III Unit 5 | China | Coal | Under construction | — | 33 MW | 1.0 GW |
| Shanggao power stationPhase II Unit 3 | China | Coal | Under construction | — | 19 MW | 1.0 GW |
| Shanggao power stationPhase II Unit 4 | China | Coal | Under construction | — | 19 MW | 1.0 GW |
| Wangting power stationUnit 7 | China | Coal | Under construction | 2024 | 15 MW | 660 MW |
| Wangting power stationUnit 8 | China | Coal | Under construction | 2024 | 15 MW | 660 MW |
| Sichuan Deyang Zhongjiang power station1-2 | China | Gas | Under construction | 2026 | 13 MW | 700 MW |
| Jiaxing power stationPhase IV Unit 10 | China | Coal | Under construction | — | 13 MW | 1.0 GW |
| Shandong Fengyuan Gas Thermal power station2 | China | Gas | Under construction | — | 9.1 MW | 200 MW |
| Parit Baru power stationUnit 2 | Indonesia | Coal | Under construction | 2033 | 3.7 MW | 50 MW |
| Parit Baru power stationUnit 1 | Indonesia | Coal | Under construction | 2033 | 3.7 MW | 50 MW |
| Shenmu power stationUnit 3-3 | China | Coal | Pre-construction | — | 100 MW | 660 MW |
| Shenmu power stationUnit 3-4 | China | Coal | Pre-construction | — | 100 MW | 660 MW |
| Fujian Hongshan power stationPhase III Unit 5 | China | Coal | Pre-construction | — | 78 MW | 1.0 GW |
| Jianbi power stationPhase VIII Unit 15 | China | Coal | Pre-construction | — | 65 MW | 1.0 GW |
| Jianbi power stationPhase VIII Unit 16 | China | Coal | Pre-construction | — | 65 MW | 1.0 GW |
| Tongling Guodian power stationPhase II Unit 4 | China | Coal | Pre-construction | 2027 | 25 MW | 1.0 GW |
| Tongling Guodian power stationPhase II Unit 3 | China | Coal | Pre-construction | 2027 | 25 MW | 1.0 GW |
| Three Gorges Energy Group Yingkou Gas Thermal power station1 | China | Gas | Pre-construction | 2027 | 20 MW | 500 MW |
| Three Gorges Energy Group Yingkou Gas Thermal power station2 | China | Gas | Pre-construction | 2027 | 20 MW | 500 MW |
| Tongliang District Distributed Energy Station1 | China | Gas | Pre-construction | — | 17 MW | 150 MW |
| Tongliang District Distributed Energy Station2 | China | Gas | Pre-construction | — | 17 MW | 150 MW |
| Kubuqi Desert South Ordos New Energy Base Supporting projectUnit 3 | China | Coal | Pre-construction | 2027 | 10 MW | 660 MW |
| Kubuqi Desert South Ordos New Energy Base Supporting projectUnit 1 | China | Coal | Pre-construction | 2027 | 10 MW | 660 MW |
| Kubuqi Desert South Ordos New Energy Base Supporting projectUnit 4 | China | Coal | Pre-construction | 2027 | 10 MW | 660 MW |
Facts
- Name
- HKSCC Nominees
- Full name
- HKSCC Nominees Ltd
- Local name
- 香港中央结算(代理人)有限公司,
- Type
- Company
- Legal form
- Ltd
- Publicly listed
- No
- Headquarters
- Hong Kong
- Registered in
- Hong Kong
- Legal Entity Identifier
- not found
- PermID
- 5000768528
- GEM entity ID
- E100001000328
Questions
How much power plant capacity does HKSCC Nominees own?
Weighted by its ownership share, HKSCC Nominees owns 10.9 GW of operating coal, oil and gas and bioenergy capacity at 136 plants in 5 countries. A further 2.2 GW is in development and 431 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is HKSCC Nominees’s largest power plant?
Shenhua Jiujiang power station in China is its largest holding by owned operating capacity (624 MW, a 15.2% share).
Who owns HKSCC Nominees?
Global Energy Monitor records 1 direct owner: Hong Kong Securities Clearing (100%).
Is HKSCC Nominees building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 2.2 GW, including 695 MW under construction.
Which fuels do HKSCC Nominees’s power plants use?
coal 93%, gas 7%, bioenergy 0%, waste-to-energy 0% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.