Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / China / Guizhou

Liupanshui Dawan Waste Coal power station

六盘水大湾低热值(CFB)煤电项目

CoalOperatingSubcritical

Dawan Town · Zhongshan District · Liupanshui · Guizhou · China

Operating capacity
660 MW
Units
2
Online since
2026
CO₂ a year
2.6 Mt

Liupanshui Dawan Waste Coal power station is a 660 MW coal power plant in Dawan Town, Guizhou, China.

It has 2 units, online since 2026. Its boilers are subcritical, burning waste coal coal. It is owned mainly by China Energy Construction Group Investment Co Ltd. Traced to the top of the ownership chain, its largest owner is China Energy Engineering Group (45%). Global Energy Monitor estimates it emits about 2.6 million tonnes of CO₂ a year. By capacity it is the 653rd largest of 1,225 operating coal plants in China.

Owner
China Energy Construction Group Investment Co Ltd

China Energy Construction Group Investment Co Ltd [100%]

Parent company
China Energy Engineering Corp Ltd [100.0%]
In development
660 MW (from 2025)
Coordinates
26.7751, 104.6531 (exact)
GEM plant ID
L100000104986

Plant details

How this coal plant is built and run.

Combustion technology
Subcritical
Coal type
Waste coal
Coal source
Domestic · minemouth (next to the mine)
Permit
September 19, 2022

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
2.61 Mt

Million tonnes, operating units

CO₂ over remaining life
91 Mt

Up to 35 more years of operation

Capacity factor
52%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
39%

From a heat rate of 8,702 Btu/kWh

If new units are built
91 Mt

Lifetime CO₂ of units in development

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2060in 34 years

No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. China Energy Engineering Group Companyowns 44.8% of China Energy Engineering
  2. China Energy Engineering Companyowns 100% of China Energy Construction Group Investment
  3. China Energy Construction Group Investment Companyowns 100% of this plant

Ultimately owned by

No share traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

2 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 2 660 MW Under construction 2025—SubcriticalWaste coal—
Unit 1 660 MW Operating 2026—SubcriticalWaste coal2.61 Mt

How it compares

Size among operating coal plants.

In China
653rd

of 1,225 coal plants · see all

In Asia
905th

of 1,872

In the world
1,127th

of 2,643 · largest coal plants

Age
0 yrs

Country average for coal: 16 yrs

This plantLiupanshui Dawan Waste Coal power station
660 MW
Average coal plantIn China, across 1,225 plants
1.0 GW
Largest in ChinaBeilun power station
7.1 GW

63% of the average coal plant in China. About 9% of the size of the largest.

FAQ

About Liupanshui Dawan Waste Coal power station.

Who owns Liupanshui Dawan Waste Coal power station?

Its main owner is China Energy Construction Group Investment Co Ltd. Traced to the top of each ownership chain, its owners are China Energy Engineering Group (45%), China Energy (30%), China Guoxin Holding (6%) and Government of Hong Kong (1%).

How big is Liupanshui Dawan Waste Coal power station?

It has 660 MW of operating capacity across 2 units. That makes it the 653rd largest coal plant in China and the 1,127th largest in the world.

Where is Liupanshui Dawan Waste Coal power station?

In Dawan Town, Zhongshan District, Liupanshui, Guizhou, China, at 26.7751, 104.6531.

When was Liupanshui Dawan Waste Coal power station built?

It started operating in 2026.

How much CO₂ does Liupanshui Dawan Waste Coal power station emit?

Global Energy Monitor estimates about 2.6 million tonnes of CO₂ a year, and 91 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.