Qili Villege · Nanjiao · Datong · Shanxi · China
- Operating capacity
- 3.1 GW
- Units
- 10
- Online since
- 1986
- CO₂ a year
- 14.7 Mt
Datong-2 power station is a 3.1 GW coal power plant in Qili Villege, Shanxi, China.
It has 10 units, which came online between 1984 and 2009. Its boilers are subcritical, burning bituminous coal. It is owned mainly by Gd Power Datong Power Generation Co Ltd. Traced to the top of the ownership chain, its largest owner is GD POWER Development (47%). Global Energy Monitor estimates it emits about 14.7 million tonnes of CO₂ a year. By capacity it is the 70th largest of 1,225 operating coal plants in China.
- Owner
- Gd Power Datong Power Generation Co Ltd
Gd Power Datong Power Generation Co Ltd [100%]
- Parent company
- Beijing Jingneng Power Co Ltd [40.0%]; GD POWER Development Co Ltd [34.5%]; China Shenhua Energy Co Ltd [25.5%]
- Retired
- 600 MW (last in 2020)
- Coordinates
- 40.0279, 113.2933 (exact)
- GEM plant ID
- L100000105025
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical, supercritical
- Coal type
- Bituminous
- Coal source
- Domestic
- Combined heat and power
- Yes
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 14.69 Mt
- CO₂ over remaining life
- 197 Mt
- Capacity factor
- 52%
- Efficiency
- 33%
Million tonnes, operating units
Up to 18 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 10,356 Btu/kWh
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Gd Power Datong Power Generation Company80.8%
- Datong Second Power Plant of Beijing Guodian Power Company19.2%
Ownership chain
- GD POWER Development Companyowns 57.5% of Beijing Guodian Electric Power
- Beijing Guodian Electric Power Companyowns 60% of Gd Power Datong Power Generation
- Gd Power Datong Power Generation Companyowns 80.8% of this plant
Ultimately owned by
- GD POWER Development Company47.1%
- Beijing Jingneng Power Company32.3%
- China Energy Investment Company14.3%
- China Energy Company3.1%
- small shareholder(s) Unidentified owners2.9%
- Government of Hong Kong Company0.2%
No share traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
10 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 200 MW | Retired | 1984 | 2020 | Subcritical | Bituminous | — |
| Unit 2 | 200 MW | Retired | 1984 | 2020 | Subcritical | Bituminous | — |
| Unit 3 | 200 MW | Retired | 1985 | 2020 | Subcritical | Bituminous | — |
| Unit 4 | 200 MW | Operating | 1986 | — | Subcritical | Bituminous | 1.15 Mt |
| Unit 5 | 200 MW | Operating | 1987 | — | Subcritical | Bituminous | 1.15 Mt |
| Unit 6 | 200 MW | Operating | 1988 | — | Subcritical | Bituminous | 1.15 Mt |
| Phase II Unit 7 | 600 MW | Operating | 2005 | — | Subcritical | Bituminous | 2.85 Mt |
| Phase II Unit 8 | 600 MW | Operating | 2005 | — | Subcritical | Bituminous | 2.85 Mt |
| Phase III Unit 10 | 660 MW | Operating | 2009 | — | Supercritical | Bituminous | 2.78 Mt |
| Phase III Unit 9 | 660 MW | Operating | 2009 | — | Supercritical | Bituminous | 2.78 Mt |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 19.4 TWh
- Capacity factor
- 71%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 19,442.03 | 71% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating coal plants.
- In Asia
- 94th
- Age
- 40 yrs
of 1,872
Country average for coal: 16 yrs
3.0× the average coal plant in China. About 44% of the size of the largest.
FAQ
About Datong-2 power station.
Who owns Datong-2 power station?
Its main owner is Gd Power Datong Power Generation Co Ltd. Traced to the top of each ownership chain, its owners are GD POWER Development (47%), Beijing Jingneng Power (32%), China Energy Investment (14%) and China Energy (3%).
How big is Datong-2 power station?
It has 3.1 GW of operating capacity across 10 units. That makes it the 70th largest coal plant in China and the 110th largest in the world.
Where is Datong-2 power station?
In Qili Villege, Nanjiao, Datong, Shanxi, China, at 40.0279, 113.2933.
When was Datong-2 power station built?
Its first unit started in 1984 and its newest in 2009.
How much CO₂ does Datong-2 power station emit?
Global Energy Monitor estimates about 14.7 million tonnes of CO₂ a year, and 197 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1070449
- GEM plant IDL100000105025
- WEPP ID1069780
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.