Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / China / Xinjiang

Shenhua Guoneng Dajing power station

国网能源新疆准东电厂

CoalOperatingUltra-supercritical

Dajing · Qitai · Changji · Xinjiang · China

Operating capacity
1.3 GW
Units
2
Online since
2023
CO₂ a year
5.0 Mt

Shenhua Guoneng Dajing power station is a 1.3 GW coal power plant in Dajing, Xinjiang, China.

It has 2 units, online since 2023. Its boilers are ultra-supercritical. It is owned mainly by Guodian Xinjiang Zhundong Coal Power Co Ltd. Traced to the top of the ownership chain, its largest owner is GD POWER Development (43%). Global Energy Monitor estimates it emits about 5.0 million tonnes of CO₂ a year. By capacity it is the 262nd largest of 1,225 operating coal plants in China.

Owner
Guodian Xinjiang Zhundong Coal Power Co Ltd

Guodian Xinjiang Zhundong Coal Power Co Ltd [100%]

Parent company
GD POWER Development Co Ltd [43.1%]; China Shenhua Energy Co Ltd [31.9%]; Xinjiang Production & Construction Corps Investment Co Ltd [25.0%]
Coordinates
44.7809, 89.5971 (exact)
GEM plant ID
L100000101672

Plant details

How this coal plant is built and run.

Combustion technology
Ultra-supercritical
Coal source
Domestic
Permit
January 15, 2015
State ownership
25% · partial state-owned enterprise

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
5.04 Mt

Million tonnes, operating units

CO₂ over remaining life
161 Mt

Up to 32 more years of operation

Capacity factor
52%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
41%

From a heat rate of 8,272 Btu/kWh

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2060in 34 years

No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. GD POWER Development Companyowns 57.5% of Beijing Guodian Electric Power
  2. Beijing Guodian Electric Power Companyowns 100% of Guodian Xinjiang Power
  3. Guodian Xinjiang Power Companyowns 75% of Guodian Xinjiang Zhundong Coal Power
  4. Guodian Xinjiang Zhundong Coal Power Companyowns 100% of this plant

Ultimately owned by

At least 25% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

2 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 1 660 MW Operating 2023—Ultra-supercritical—2.52 Mt
Unit 2 660 MW Operating 2023—Ultra-supercritical—2.52 Mt

How it compares

Size among operating coal plants.

In China
262nd

of 1,225 coal plants · see all

In Asia
394th

of 1,872

In the world
509th

of 2,643 · largest coal plants

Age
3 yrs

Country average for coal: 16 yrs

This plantShenhua Guoneng Dajing power station
1.3 GW
Average coal plantIn China, across 1,225 plants
1.0 GW
Largest in ChinaBeilun power station
7.1 GW

1.3× the average coal plant in China. About 19% of the size of the largest.

FAQ

About Shenhua Guoneng Dajing power station.

Who owns Shenhua Guoneng Dajing power station?

Its main owner is Guodian Xinjiang Zhundong Coal Power Co Ltd. Traced to the top of each ownership chain, its owners are GD POWER Development (43%), Corps State-owned Assets Supervision and Administration Commission (25%), China Energy Investment (22%) and China Energy (5%).

How big is Shenhua Guoneng Dajing power station?

It has 1.3 GW of operating capacity across 2 units. That makes it the 262nd largest coal plant in China and the 509th largest in the world.

Where is Shenhua Guoneng Dajing power station?

In Dajing, Qitai, Changji, Xinjiang, China, at 44.7809, 89.5971.

When was Shenhua Guoneng Dajing power station built?

It started operating in 2023.

How much CO₂ does Shenhua Guoneng Dajing power station emit?

Global Energy Monitor estimates about 5.0 million tonnes of CO₂ a year, and 161 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.