All plants / United States / Washington
Wells hydroelectric plant (United States)
Pateros · Douglas County · Washington · United States
- Operating capacity
- 855 MW
- Units
- 1
- Online since
- 1967
- Age
- 59 yrs
Wells hydroelectric plant (United States) is an 855 MW hydropower plant in Pateros, Washington, United States.
It has been operating since 1967. It is a conventional storage plant on the Columbia River. It is owned mainly by Douglas County Public Utility District. By capacity it is the 26th largest of 1,436 operating hydropower plants in the United States.
- Owner
- Douglas County Public Utility District
Douglas County Public Utility District [100%]
- Operator
- Douglas County Public Utility District
- Coordinates
- 47.9469, -119.8650 (exact)
- GEM plant ID
- L100000603961
Plant details
How this hydropower plant is built and run.
- Type
- Conventional storage
- River
- Columbia River
- Turbines
- 3 x 77.4 MW; 7 x 89 MW
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 3.7 TWh
- Capacity factor
- 49%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 4,479.69 | 3,463.68 | 60% | HYDRO-V1 |
| 2014 | 4,433.36 | 3,293.13 | 59% | HYDRO-V1 |
| 2015 | 4,305.01 | 3,859.80 | 57% | HYDRO-V1 |
| 2016 | 4,320.98 | 3,399.34 | 58% | HYDRO-V1 |
| 2017 | 4,542.20 | 3,037.80 | 61% | HYDRO-V1 |
| 2018 | 4,438.94 | — | 59% | — |
| 2019 | 3,687.03 | — | 49% | — |
How it compares
Size among operating hydropower plants.
- Age
- 59 yrs
Country average for hydropower: 71 yrs
12× the average hydropower plant in the United States. About 20% of the size of the largest.
FAQ
About Wells hydroelectric plant (United States).
Who owns Wells hydroelectric plant (United States)?
Its main owner is Douglas County Public Utility District.
How big is Wells hydroelectric plant (United States)?
It has 855 MW of operating capacity. That makes it the 26th largest hydropower plant in the United States and the 365th largest in the world.
Where is Wells hydroelectric plant (United States)?
In Pateros, Douglas County, Washington, United States, at 47.9469, -119.8650.
When was Wells hydroelectric plant (United States) built?
It started operating in 1967.
Which river is Wells hydroelectric plant (United States) on?
The Columbia River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0003886
- GEM plant IDL100000603961
- WEPP ID18575
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.