All plants / United States / Washington
Chief Joseph hydroelectric plant
Bridgeport · Douglas County · Washington · United States
- Operating capacity
- 2.5 GW
- Units
- 1
- Online since
- 1955
- Age
- 71 yrs
Chief Joseph hydroelectric plant is a 2.5 GW hydropower plant in Bridgeport, Washington, United States.
It has been operating since 1955. It is a conventional storage plant on the Columbia River. It is owned mainly by US Army Corps of Engineers - Seattle District. By capacity it is the 3rd largest of 1,436 operating hydropower plants in the United States.
- Owner
- US Army Corps of Engineers - Seattle District
US Army Corps of Engineers - Seattle District [100%]
- Operator
- US Army Corps of Engineers - Seattle District
- Coordinates
- 47.9951, -119.6401 (exact)
- GEM plant ID
- L100000603764
Plant details
How this hydropower plant is built and run.
- Type
- Conventional storage
- River
- Columbia River
- Turbines
- 16 x 88.2 MW; 11 x 95 MW
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 9.9 TWh
- Capacity factor
- 46%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 12,187.70 | 10,255.53 | 57% | HYDRO-V1 |
| 2014 | 11,643.56 | 10,229.49 | 54% | HYDRO-V1 |
| 2015 | 11,462.30 | 12,027.74 | 53% | HYDRO-V1 |
| 2016 | 11,638.21 | 10,257.52 | 54% | HYDRO-V1 |
| 2017 | 11,422.43 | 9,419.23 | 53% | HYDRO-V1 |
| 2018 | 12,352.47 | — | 57% | — |
| 2019 | 9,854.02 | — | 46% | — |
How it compares
Size among operating hydropower plants.
- Age
- 71 yrs
Country average for hydropower: 71 yrs
34× the average hydropower plant in the United States. About 58% of the size of the largest.
FAQ
About Chief Joseph hydroelectric plant.
Who owns Chief Joseph hydroelectric plant?
Its main owner is US Army Corps of Engineers - Seattle District.
How big is Chief Joseph hydroelectric plant?
It has 2.5 GW of operating capacity. That makes it the 3rd largest hydropower plant in the United States and the 52nd largest in the world.
Where is Chief Joseph hydroelectric plant?
In Bridgeport, Douglas County, Washington, United States, at 47.9951, -119.6401.
When was Chief Joseph hydroelectric plant built?
It started operating in 1955.
Which river is Chief Joseph hydroelectric plant on?
The Columbia River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0003921
- GEM plant IDL100000603764
- WEPP ID35542
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.