All plants / United States / Washington
Rocky Reach hydroelectric plant
Wenatchee · Chelan County · Washington · United States
- Operating capacity
- 1.3 GW
- Units
- 1
- Online since
- 1961
- Age
- 65 yrs
Rocky Reach hydroelectric plant is a 1.3 GW hydropower plant in Wenatchee, Washington, United States.
It has been operating since 1961. It is a run-of-river plant on the Columbia River. It is owned mainly by Chelan County Public Utility District. By capacity it is the 13th largest of 1,436 operating hydropower plants in the United States.
- Owner
- Chelan County Public Utility District
Chelan County Public Utility District [100%]
- Operator
- Chelan County Public Utility District
- Coordinates
- 47.5336, -120.2950 (exact)
- GEM plant ID
- L100000603914
Plant details
How this hydropower plant is built and run.
- Type
- Run-of-river
- River
- Columbia River
- Turbines
- 7 x 114 MW; 4 x 125.4 MW
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 5.0 TWh
- Capacity factor
- 44%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 6,360.92 | 5,861.62 | 56% | HYDRO-V1 |
| 2014 | 6,293.83 | 5,575.25 | 55% | HYDRO-V1 |
| 2015 | 5,948.23 | 6,364.00 | 52% | HYDRO-V1 |
| 2016 | 6,069.43 | 5,863.86 | 53% | HYDRO-V1 |
| 2017 | 6,141.09 | 4,983.80 | 54% | HYDRO-V1 |
| 2018 | 6,287.76 | — | 55% | — |
| 2019 | 5,020.82 | — | 44% | — |
How it compares
Size among operating hydropower plants.
- Age
- 65 yrs
Country average for hydropower: 71 yrs
18× the average hydropower plant in the United States. About 31% of the size of the largest.
FAQ
About Rocky Reach hydroelectric plant.
Who owns Rocky Reach hydroelectric plant?
Its main owner is Chelan County Public Utility District.
How big is Rocky Reach hydroelectric plant?
It has 1.3 GW of operating capacity. That makes it the 13th largest hydropower plant in the United States and the 169th largest in the world.
Where is Rocky Reach hydroelectric plant?
In Wenatchee, Chelan County, Washington, United States, at 47.5336, -120.2950.
When was Rocky Reach hydroelectric plant built?
It started operating in 1961.
Which river is Rocky Reach hydroelectric plant on?
The Columbia River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0003883
- GEM plant IDL100000603914
- WEPP ID16144
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.