Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / United States / Washington

Upper Baker hydroelectric plant

HydroOperatingConventional storage

Concrete · Whatcom County · Washington · United States

Operating capacity
105 MW
Units
1
Online since
1959
Age
67 yrs

Upper Baker hydroelectric plant is a 105 MW hydropower plant in Concrete, Washington, United States.

It has been operating since 1959. It is a conventional storage plant on the Baker River. It is owned mainly by Puget Sound Energy (PSE) and operated by Puget Sound Energy. By capacity it is the 183rd largest of 1,436 operating hydropower plants in the United States.

Owner
Puget Sound Energy (PSE)

Puget Sound Energy (PSE) [100%]

Operator
Puget Sound Energy
Coordinates
48.6490, -121.6910 (exact)
GEM plant ID
L100000603949

Plant details

How this hydropower plant is built and run.

Type
Conventional storage
River
Baker River
Turbines
2 x 52.4 MW
Complex
Baker River Complex

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
263 GWh

Reported · 2019

Capacity factor
29%

Output as a share of running at full power all year

Reported by
U.S. Energy Information Administration
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 356.55 317.76 39% HYDRO-V1
2014 340.09 317.76 37% HYDRO-V1
2015 278.75 289.98 30% HYDRO-V1
2016 369.11 318.63 40% HYDRO-V1
2017 355.74 274.19 39% HYDRO-V1
2018 333.79 — 36% —
2019 262.95 — 29% —

How it compares

Size among operating hydropower plants.

In the United States
183rd

of 1,436 hydropower plants · see all

In the world
2,261st

of 9,108 · largest hydropower plants

Age
67 yrs

Country average for hydropower: 71 yrs

This plantUpper Baker hydroelectric plant
105 MW
Average hydropower plantIn the United States, across 1,436 plants
71 MW
Largest in the United StatesNathaniel Washington hydroelectric plant
4.2 GW

1.5× the average hydropower plant in the United States. About 2% of the size of the largest.

FAQ

About Upper Baker hydroelectric plant.

Who owns Upper Baker hydroelectric plant?

Its main owner is Puget Sound Energy (PSE). It is operated by Puget Sound Energy.

How big is Upper Baker hydroelectric plant?

It has 105 MW of operating capacity. That makes it the 183rd largest hydropower plant in the United States and the 2,261st largest in the world.

Where is Upper Baker hydroelectric plant?

In Concrete, Whatcom County, Washington, United States, at 48.6490, -121.6910.

When was Upper Baker hydroelectric plant built?

It started operating in 1959.

Which river is Upper Baker hydroelectric plant on?

The Baker River.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0003861
  • GEM plant IDL100000603949
  • WEPP ID30972

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.