All plants / United States / Washington
Upper Baker hydroelectric plant
Concrete · Whatcom County · Washington · United States
- Operating capacity
- 105 MW
- Units
- 1
- Online since
- 1959
- Age
- 67 yrs
Upper Baker hydroelectric plant is a 105 MW hydropower plant in Concrete, Washington, United States.
It has been operating since 1959. It is a conventional storage plant on the Baker River. It is owned mainly by Puget Sound Energy (PSE) and operated by Puget Sound Energy. By capacity it is the 183rd largest of 1,436 operating hydropower plants in the United States.
- Owner
- Puget Sound Energy (PSE)
Puget Sound Energy (PSE) [100%]
- Operator
- Puget Sound Energy
- Coordinates
- 48.6490, -121.6910 (exact)
- GEM plant ID
- L100000603949
Plant details
How this hydropower plant is built and run.
- Type
- Conventional storage
- River
- Baker River
- Turbines
- 2 x 52.4 MW
- Complex
- Baker River Complex
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 263 GWh
- Capacity factor
- 29%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 356.55 | 317.76 | 39% | HYDRO-V1 |
| 2014 | 340.09 | 317.76 | 37% | HYDRO-V1 |
| 2015 | 278.75 | 289.98 | 30% | HYDRO-V1 |
| 2016 | 369.11 | 318.63 | 40% | HYDRO-V1 |
| 2017 | 355.74 | 274.19 | 39% | HYDRO-V1 |
| 2018 | 333.79 | — | 36% | — |
| 2019 | 262.95 | — | 29% | — |
How it compares
Size among operating hydropower plants.
- Age
- 67 yrs
Country average for hydropower: 71 yrs
1.5× the average hydropower plant in the United States. About 2% of the size of the largest.
FAQ
About Upper Baker hydroelectric plant.
Who owns Upper Baker hydroelectric plant?
Its main owner is Puget Sound Energy (PSE). It is operated by Puget Sound Energy.
How big is Upper Baker hydroelectric plant?
It has 105 MW of operating capacity. That makes it the 183rd largest hydropower plant in the United States and the 2,261st largest in the world.
Where is Upper Baker hydroelectric plant?
In Concrete, Whatcom County, Washington, United States, at 48.6490, -121.6910.
When was Upper Baker hydroelectric plant built?
It started operating in 1959.
Which river is Upper Baker hydroelectric plant on?
The Baker River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0003861
- GEM plant IDL100000603949
- WEPP ID30972
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.