All plants / China / Guangxi
Nanning power station
国电南宁发电厂
East Liujing Town · Heng · Nanning · Guangxi · China
- Operating capacity
- 1.3 GW
- Units
- 4
- Online since
- 2011
- CO₂ a year
- 5.8 Mt
Nanning power station is a 1.3 GW coal power plant in East Liujing Town, Guangxi, China.
It has 4 units, which came online between 2011 and 2012. Its boilers are supercritical, burning anthracite coal. It is owned mainly by Guodian Nanning Power Generation Co Ltd. Traced to the top of the ownership chain, its largest owner is China Energy Investment (51%). Global Energy Monitor estimates it emits about 5.8 million tonnes of CO₂ a year. By capacity it is the 262nd largest of 1,225 operating coal plants in China.
- Owner
- Guodian Nanning Power Generation Co Ltd
Guodian Nanning Power Generation Co Ltd [100%]
- Parent company
- China Energy Investment Corp [51.0%]; Shenzhen Energy Group Co Ltd [47.3%]; unknown [1.7%]
- In development
- 1.3 GW (from 2017)
- Coordinates
- 22.7885, 108.9400 (exact)
- GEM plant ID
- L100000100442
Plant details
How this coal plant is built and run.
- Combustion technology
- Supercritical, ultra-supercritical
- Coal type
- Anthracite
- Coal source
- Domestic
- Combined heat and power
- Yes
- Permit
- December 2009
- State ownership
- 21% · partial state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 5.77 Mt
- CO₂ over remaining life
- 118 Mt
- Capacity factor
- 52%
- Efficiency
- 37%
- If new units are built
- 177 Mt
Million tonnes, operating units
Up to 21 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 9,250 Btu/kWh
Lifetime CO₂ of units in development
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Guodian Nanning Power Generation Company100%
Ownership chain
- China Energy Investment Companyowns 100% of Guodian Guangxi Electric Power
- Guodian Guangxi Electric Power Companyowns 51% of Guodian Nanning Power Generation
- Guodian Nanning Power Generation Companyowns 100% of this plant
Ultimately owned by
- China Energy Investment Company51%
- Shenzhen State-Owned Assets Supervision and Administration Commission of the State Council State body20.8%
- Share not traceable16.4%
- Huaneng Power International Company11.8%
At least 20.8% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
4 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | 660 MW | Operating | 2011 | — | Supercritical | Anthracite | 2.88 Mt |
| Phase I Unit 2 | 660 MW | Operating | 2012 | — | Supercritical | Anthracite | 2.88 Mt |
| Phase II Unit 3 | 660 MW | Announced | 2017 | — | Ultra-supercritical | — | — |
| Phase II Unit 4 | 660 MW | Announced | 2017 | — | Ultra-supercritical | — | — |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 6.4 TWh
- Capacity factor
- 56%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 6,431.95 | 56% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating coal plants.
- In Asia
- 394th
- Age
- 15 yrs
of 1,872
Country average for coal: 16 yrs
1.3× the average coal plant in China. About 19% of the size of the largest.
FAQ
About Nanning power station.
Who owns Nanning power station?
Its main owner is Guodian Nanning Power Generation Co Ltd. Traced to the top of each ownership chain, its owners are China Energy Investment (51%), Shenzhen State-Owned Assets Supervision and Administration Commission of the State Council (21%) and Huaneng Power International (12%).
How big is Nanning power station?
It has 1.3 GW of operating capacity across 4 units. That makes it the 262nd largest coal plant in China and the 509th largest in the world.
Where is Nanning power station?
In East Liujing Town, Heng, Nanning, Guangxi, China, at 22.7885, 108.9400.
When was Nanning power station built?
Its first unit started in 2011 and its newest in 2012.
How much CO₂ does Nanning power station emit?
Global Energy Monitor estimates about 5.8 million tonnes of CO₂ a year, and 118 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1070371
- GEM plant IDL100000100442
- WEPP ID1069660
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.