All plants / China / Guangxi
Nanning Liujing Cogen power station
南宁市六景工业园区公共热电联产项目
Nanning · Guangxi · China
- Operating capacity
- 230 MW
- Units
- 6
- Online since
- 2024
- CO₂ a year
- 0.2 Mt
Nanning Liujing Cogen power station is a 230 MW bioenergy power plant in Nanning, Guangxi, China.
It has 6 units, which came online between 2024 and 2025. Its boilers are subcritical. It is owned mainly by Nanning Sun Paper Co Ltd. Traced to the top of the ownership chain, its largest owner is Shandong SUN Paper (100%). Global Energy Monitor estimates it emits about 0.2 million tonnes of CO₂ a year. By capacity it is the 5th largest of 362 operating bioenergy plants in China.
- Owner
- Nanning Sun Paper Co Ltd
Nanning Sun Paper Co Ltd [100%]
- Parent company
- Shandong SUN Paper Co Ltd [100.0%]
- In development
- 100 MW
- Coordinates
- 22.8428, 108.9101 (exact)
- GEM plant ID
- L100000104926
Plant details
How this bioenergy plant is built and run.
- Combustion technology
- Subcritical
- Coal source
- Domestic/imported
- Combined heat and power
- Yes
- Captive plant
- Supplies industrial park industry (power and heat)
- Permit
- July 23, 2022
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 0.24 Mt
- CO₂ over remaining life
- 8 Mt
- Capacity factor
- 52%
- Efficiency
- 33%
- If new units are built
- 17 Mt
Million tonnes, operating units
Up to 33 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 10,442 Btu/kWh
Lifetime CO₂ of units in development
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Nanning Sun Paper Company100%
Ownership chain
- Shandong SUN Paper Companyowns 100% of Nanning Sun Paper
- Nanning Sun Paper Companyowns 100% of this plant
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
6 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | 50 MW | Operating | 2024 | — | Subcritical | — | 0.24 Mt |
| 1.0 | 80 MW | Operating | 2025 | — | — | Bioenergy: paper mill wastes, bioenergy: wastewater and sewage sludge (solids or biogas) | — |
| 46054.0 | 50 MW | Operating | 2025 | — | — | Bioenergy: paper mill wastes | — |
| 46055.0 | 50 MW | Operating | 2025 | — | — | Bioenergy: paper mill wastes | — |
| Phase II Unit 2 | 50 MW | Pre-construction | — | — | Subcritical | — | — |
| Phase II Unit 3 | 50 MW | Pre-construction | — | — | Subcritical | — | — |
How it compares
Size among operating bioenergy plants.
- In Asia
- 8th
- Age
- 2 yrs
of 845
Country average for bioenergy: 8 yrs
5.5× the average bioenergy plant in China. About 43% of the size of the largest.
FAQ
About Nanning Liujing Cogen power station.
Who owns Nanning Liujing Cogen power station?
Its main owner is Nanning Sun Paper Co Ltd. Traced to the top of each ownership chain, its owners are Shandong SUN Paper (100%).
How big is Nanning Liujing Cogen power station?
It has 230 MW of operating capacity across 6 units. That makes it the 5th largest bioenergy plant in China and the 29th largest in the world.
Where is Nanning Liujing Cogen power station?
In Nanning, Guangxi, China, at 22.8428, 108.9101.
When was Nanning Liujing Cogen power station built?
Its first unit started in 2024 and its newest in 2025.
How much CO₂ does Nanning Liujing Cogen power station emit?
Global Energy Monitor estimates about 0.2 million tonnes of CO₂ a year, and 8 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000104926
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.