- Owned operating capacity
- 3.2 GW
- Operating plants
- 67
- In development
- 834 MW
- Countries
- 16
- Global rank
- #675
Citigroup is recorded by Global Energy Monitor as a company headquartered in United States, listed on a stock exchange. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 3.2 GW at 67 plants in 16 countries, ranking #675 of 13,356 owners on this site. 54% of that is coal, followed by gas (41%). Its largest holding is Manjung power station in Malaysia, where its share of 14% equals 574 MW. The biggest part is held through Citigroup Nominees (Tempatan) (about 1.6 GW). A further 834 MW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 23 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating3.2 GW61%
- Under construction259 MW5%
- Pre-construction348 MW7%
- Announced226 MW4%
- Shelved43 MW0.8%
- Retired664 MW13%
- Cancelled485 MW9%
Operating, by fuel
Operating, by country (top 10)
Operating capacity by decade it started · average age 23 years
Map
67 operating plants with a stake held by Citigroup.
Compared with peers
Largest company owners in United States, by owned operating capacity.
Ownership structure
Who owns Citigroup, and what it owns.
Owns 3 companies
- Citigroup Nominees (Tempatan) 1.6 GW operating100%
- Citibank National Association 1.4 GW operating100%
- Citibank Europe 108 MW operating100%
Power plants
90 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| Manjung power stationPerak · indirect | Malaysia | Coal | Operating | 14% | 574 MW | 4.1 GW |
| Eraring power stationNew South Wales · indirect | Australia | Coal | Operating | 10.1% | 291 MW | 2.9 GW |
| Bayswater power stationNew South Wales · indirect | Australia | Coal | Operating | 9.1% | 243 MW | 2.7 GW |
| Tuanku Jaafar power stationNegeri Sembilan · indirect | Malaysia | Gas | Operating | 14% | 210 MW | 1.5 GW |
| Loy Yang A power stationVictoria · indirect | Australia | Coal | Operating | 9.1% | 202 MW | 2.2 GW |
| Jimah East power stationNegeri Sembilan · indirect | Malaysia | Coal | Operating | 9.8% | 196 MW | 2.0 GW |
| Sultan Aziz power stationSelangor · indirect | Malaysia | Coal | Operating | 8.4% | 182 MW | 2.2 GW |
| Prai (TNB) power stationPulau Pinang · indirect | Malaysia | Gas | Operating | 14% | 150 MW | 1.1 GW |
| Pasir Gudang SIPP power stationJohor · indirect | Malaysia | Gas | Operating | 9.8% | 141 MW | 1.4 GW |
| Torrens Island power stationSouth Australia · indirect | Australia | Gas | Operating | 9.1% | 73 MW | 800 MW |
| Uranquinty power stationNew South Wales · indirect | Australia | Gas | Operating | 10.1% | 67 MW | 664 MW |
| Darling Downs power stationQueensland · indirect | Australia | Gas | Operating | 10.1% | 65 MW | 644 MW |
| Mortlake power stationVictoria · indirect | Australia | Gas | Operating | 10.1% | 59 MW | 584 MW |
| Connaught Bridge power stationSelangor · indirect | Malaysia | Gas | Operating | 14% | 53 MW | 375 MW |
| Jimah power stationNegeri Sembilan · indirect | Malaysia | Coal | Operating | 3.5% | 49 MW | 1.4 GW |
| Keppel Sakra cogeneration power stationSouth West · indirect | Singapore | Gas | Operating | 8.1% | 49 MW | 600 MW |
| Keppel Merlimau cogeneration power stationSouth West · indirect | Singapore | Gas | Operating | 3.5% | 46 MW | 1.3 GW |
| Solomon Hub mine power stationWestern Australia · indirect | Australia | Gas | Operating | 35.4% | 44 MW | 125 MW |
| Mt Stuart power stationQueensland · indirect | Australia | Oil | Operating | 10.1% | 43 MW | 423 MW |
| Putrajaya power stationSelangor · indirect | Malaysia | Gas | Operating | 14% | 38 MW | 270 MW |
| Kelar power stationAntofagasta · indirect | Chile | Gas | Operating | 6.3% | 33 MW | 517 MW |
| CCC Norte-III power stationChihuahua · indirect | Mexico | Gas | Operating | 3.6% | 32 MW | 906 MW |
| UPM Paso de los Toros power stationDurazno · indirect | Uruguay | Biomass | Operating | 7.6% | 24 MW | 310 MW |
| Diamantina power stationQueensland · indirect | Australia | Gas | Operating | 9% | 22 MW | 242 MW |
| Sengkang power stationSulawesi · indirect | Indonesia | Gas | Operating | 6.1% | 19 MW | 315 MW |
| Barker Inlet power stationSouth Australia · indirect | Australia | Gas | Operating | 9.1% | 19 MW | 210 MW |
| Lumut GB3 power stationPerak · indirect | Malaysia | Gas | Operating | 2.8% | 18 MW | 640 MW |
| UPM Schongau power stationBayern · indirect | Germany | Gas | Operating | 8.4% | 15 MW | 178 MW |
| Patau-Patau power stationSabah · indirect | Malaysia | Gas | Operating | 11.6% | 13 MW | 112 MW |
| Quarantine power stationSouth Australia · indirect | Australia | Gas | Operating | 5.5% | 13 MW | 234 MW |
| UPM power stationRío Negro · indirect | Uruguay | Biomass | Operating | 7.6% | 12 MW | 160 MW |
| Yarnima power stationWestern Australia · indirect | Australia | Gas | Operating | 6.3% | 12 MW | 190 MW |
| Shek Kwu Chau power stationindirect | Hong Kong | Waste | Operating | 19.3% | 12 MW | 60 MW |
| Kwinana Swift power plantWestern Australia · indirect | Australia | Gas | Operating | 9.1% | 11 MW | 120 MW |
| Alholmens Kraft power stationPohjanmaa · indirect | Finland | Biomass | Operating | 3.8% | 10 MW | 265 MW |
| Opatovice power stationPardubický · indirect | Czech Republic | Coal | Operating | 2.7% | 9.8 MW | 360 MW |
| Osborne power stationSouth Australia · indirect | Australia | Gas | Operating | 5.1% | 9.1 MW | 180 MW |
| Roma power stationQueensland · indirect | Australia | Gas | Operating | 10.1% | 8.1 MW | 80 MW |
| Ladbroke Grove power stationSouth Australia · indirect | Australia | Gas | Operating | 10.1% | 8.1 MW | 80 MW |
| Pietarsaari power stationPohjanmaa · indirect | Finland | Biomass | Operating | 8.4% | 8.0 MW | 95 MW |
| Kymi Mill power stationKymenlaakso · indirect | Finland | Biomass | Operating | 8.4% | 7.3 MW | 87 MW |
| Emsland Mill power stationNiedersachsen · indirect | Germany | Gas | Operating | 8.4% | 7.1 MW | 84 MW |
| Kaukas power stationEtelä-Karjala · indirect | Finland | Biomass | Operating | 8.4% | 5.6 MW | 67 MW |
| Newman (AU) power stationWestern Australia · indirect | Australia | Gas | Operating | 2.3% | 5.4 MW | 238 MW |
| Leichhardt power stationQueensland · indirect | Australia | Gas | Operating | 9% | 5.4 MW | 60 MW |
| Komorany power stationÚstecký · indirect | Czech Republic | Coal | Operating | 2.7% | 5.4 MW | 197 MW |
| Port Moresby power stationNational Capital District (Port Moresby) · indirect | Papua New Guinea | Gas | Operating | 8.4% | 4.9 MW | 59 MW |
| Jämsänkosk Mill power stationKeski-Suomi · indirect | Finland | Biomass | Operating | 8.4% | 3.6 MW | 43 MW |
| Kaukan Voima power stationEtelä-Karjala · indirect | Finland | Biomass | Operating | 2.3% | 2.7 MW | 119 MW |
| Porin Prosessivoiman power stationSatakunta · indirect | Finland | Biomass | Operating | 3.7% | 2.4 MW | 65 MW |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| New Kapar power plant1 | Malaysia | Gas | Under construction | 2031 | 147 MW | 2.1 GW |
| Woodside Louisiana LNG Terminal power stationPhase 1 | United States | Gas | Under construction | 2029 | 43 MW | 430 MW |
| Perlis power station2 | Malaysia | Gas | Under construction | — | 42 MW | 1.5 GW |
| Shek Kwu Chau power station44928.0 | Hong Kong | Waste | Under construction | 2028 | 12 MW | 60 MW |
| Shek Kwu Chau power station44929.0 | Hong Kong | Waste | Under construction | 2030 | 12 MW | 60 MW |
| Komorany power station1 | Czech Republic | Gas | Under construction | 2027 | 2.3 MW | 85 MW |
| VIRTUS LONDON121 | United Kingdom | Oil | Under construction | — | 1.9 MW | 44 MW |
| Pasir Gudang (TNB) power stationGT | Malaysia | Gas | Pre-construction | — | 105 MW | 750 MW |
| Paka (YTL) power station3 | Malaysia | Gas | Pre-construction | 2030 | 98 MW | 1.4 GW |
| Gelugor power station2 | Malaysia | Gas | Pre-construction | 2027 | 53 MW | 375 MW |
| Brigalow Peaking Power PlantGT1-12 | Australia | Gas | Pre-construction | 2028 | 29 MW | 400 MW |
| Barker Inlet power station2 | Australia | Gas | Pre-construction | — | 25 MW | 280 MW |
| K2 power station1 | Australia | Gas | Pre-construction | 2029 | 20 MW | 220 MW |
| Isaac power stationUnit 1 | Australia | Gas | Pre-construction | 2027 | 4.7 MW | 56 MW |
| Isaac power stationUnit 2 | Australia | Gas | Pre-construction | 2027 | 4.7 MW | 56 MW |
| Komorany power station2 | Czech Republic | Gas | Pre-construction | 2029 | 2.3 MW | 85 MW |
| Opatovice power stationCC2 | Czech Republic | Gas | Pre-construction | 2028 | 1.8 MW | 65 MW |
| Opatovice power stationCC1 | Czech Republic | Gas | Pre-construction | 2027 | 1.8 MW | 65 MW |
| Opatovice power stationCC3 | Czech Republic | Gas | Pre-construction | 2028 | 1.8 MW | 65 MW |
| Plzen CHP power stationUnit 1R | Czech Republic | Gas | Pre-construction | 2029 | 1.0 MW | 100 MW |
| Plzenska energetika ELU III power stationUnit 1R, timepoint 1 | Czech Republic | Gas | Pre-construction | 2029 | 0.6 MW | 65 MW |
| Tarrone GT power station1 | Australia | Gas | Announced | — | 55 MW | 600 MW |
| NSW Gas Peaker Power Station1 | Australia | Gas | Announced | — | 46 MW | 500 MW |
| Kerrawary Power Station1 | Australia | Gas | Announced | 2029 | 39 MW | 385 MW |
| Kerrawary Power Station2 | Australia | Gas | Announced | 2029 | 39 MW | 385 MW |
| Quarantine power stationQPS6 | Australia | Gas | Announced | — | 17 MW | 165 MW |
| VIRTUS Stockley Park Campus1 | United Kingdom | Oil | Announced | — | 8.8 MW | 200 MW |
| Mortlake power station2-4 | Australia | Gas | Announced | — | 5.1 MW | 50 MW |
| Mortlake power station2-1 | Australia | Gas | Announced | — | 5.1 MW | 50 MW |
| Mortlake power station2-3 | Australia | Gas | Announced | — | 5.1 MW | 50 MW |
Facts
- Name
- Citigroup
- Full name
- Citigroup Inc
- Type
- Company
- Legal form
- Inc
- Publicly listed
- Yes
- Headquarters
- New York, United States
- Registered in
- Delaware, United States
- Website
- citigroup.com
- Legal Entity Identifier
- 6SHGI4ZSSLCXXQSBB395
- PermID
- 8589934316
- US SEC CIK
- 0000831001
- GEM entity ID
- E100000135826
Questions
How much power plant capacity does Citigroup own?
Weighted by its ownership share, Citigroup owns 3.2 GW of operating coal, oil and gas and bioenergy capacity at 67 plants in 16 countries. A further 834 MW is in development and 664 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is Citigroup’s largest power plant?
Manjung power station in Malaysia is its largest holding by owned operating capacity (574 MW, a 14% share).
Who owns Citigroup?
Global Energy Monitor records 2 direct owners: BlackRock (8.8%); The Vanguard Group (8.8%).
Is Citigroup building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 834 MW, including 259 MW under construction.
Which fuels do Citigroup’s power plants use?
coal 54%, gas 41%, bioenergy 3%, oil 1%, waste-to-energy 1% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.