Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Malaysia / Selangor

New Kapar power plant

GasUnder constructionCombined cycle

Kapar · Selangor · Malaysia

Planned capacity
2.1 GW
Units
1
Expected online
2031
Output a year
12.1 TWh

New Kapar power plant is a 2.1 GW gas power plant under construction in Kapar, Selangor, Malaysia.

It is expected to start operating in 2031. It uses combined cycle technology burning natural gas. It is owned mainly by TNB Power Generation Sdn Bhd. Traced to the top of the ownership chain, its largest owner is Widad Business Group (50%).

Owner
TNB Power Generation Sdn Bhd

TNB Power Generation Sdn Bhd [50%]; Widad Business Group Sdn Bhd [50%]

Parent company
Tenaga Nasional Bhd [50.0%]; Widad Business Group Sdn Bhd [50.0%]
In development
2.1 GW (from 2031)
Coordinates
3.1250, 101.3255 (approximate)
GEM plant ID
L100000407902

Plant details

How this gas plant is built and run.

Technology
Combined cycle
Fuel
Fossil gas: natural gas
Fuel classification
Gas

Who owns it

Direct owners, and the owners at the top of each chain.

Direct owners

Ownership chain

  1. small shareholder(s) Unidentified ownersowns 57.5% of Tenaga Nasional
  2. Tenaga Nasional Companyowns 100% of TNB Power Generation
  3. TNB Power Generation Companyowns 50% of this plant

Ultimately owned by

At least 12.5% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
12.1 TWh

Estimated · 2017

Capacity factor
66%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 12,092.77 66% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

FAQ

About New Kapar power plant.

Who owns New Kapar power plant?

Its main owner is TNB Power Generation Sdn Bhd. Traced to the top of each ownership chain, its owners are Widad Business Group (50%) and Government of Malaysia (13%).

How big is New Kapar power plant?

It is planned at 2.1 GW.

Is New Kapar power plant operating yet?

Not yet. It is under construction and expected online in 2031.

Where is New Kapar power plant?

In Kapar, Selangor, Malaysia, at 3.1250, 101.3255.

How much electricity does New Kapar power plant generate?

An estimated 12.1 TWh was generated in 2017, a capacity factor of 66%, according to the WRI Global Power Plant Database.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.