All plants / United States / Georgia
Sinclair Dam hydroelectric plant
Baldwin County · Georgia · United States
- Operating capacity
- 45 MW
- Units
- 1
- Online since
- 1953
- Age
- 73 yrs
Sinclair Dam hydroelectric plant is a 45 MW hydropower plant in Baldwin County, Georgia, United States.
It has been operating since 1953. It is a run-of-river plant on the Oconee River. It is owned mainly by Georgia Power Co and operated by Georgia Power. By capacity it is the 313th largest of 1,436 operating hydropower plants in the United States.
- Owner
- Georgia Power Co
- Operator
- Georgia Power
- Coordinates
- 33.1403, -83.2028 (exact)
- GEM plant ID
- L100001023348
Plant details
How this hydropower plant is built and run.
- Type
- Run-of-river
- River
- Oconee River
- Turbines
- 2 x 22.5 MW
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 113 GWh
- Capacity factor
- 29%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 135.56 | 156.17 | 34% | HYDRO-V1 |
| 2014 | 104.75 | 172.69 | 27% | HYDRO-V1 |
| 2015 | 132.83 | 128.16 | 34% | HYDRO-V1 |
| 2016 | 86.89 | 164.51 | 22% | HYDRO-V1 |
| 2017 | 84.40 | 129.10 | 21% | HYDRO-V1 |
| 2018 | 131.51 | — | 33% | — |
| 2019 | 113.36 | — | 29% | — |
How it compares
Size among operating hydropower plants.
- Age
- 73 yrs
Country average for hydropower: 71 yrs
63% of the average hydropower plant in the United States. About 1% of the size of the largest.
FAQ
About Sinclair Dam hydroelectric plant.
Who owns Sinclair Dam hydroelectric plant?
Its main owner is Georgia Power Co. It is operated by Georgia Power.
How big is Sinclair Dam hydroelectric plant?
It has 45 MW of operating capacity. That makes it the 313th largest hydropower plant in the United States and the 3,881st largest in the world.
Where is Sinclair Dam hydroelectric plant?
In Baldwin County, Georgia, United States, at 33.1403, -83.2028.
When was Sinclair Dam hydroelectric plant built?
It started operating in 1953.
Which river is Sinclair Dam hydroelectric plant on?
The Oconee River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0000722
- GEM plant IDL100001023348
- WEPP ID21000
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.