All plants / United States / Georgia
Richard B. Russell hydroelectric plant
Elberton · Elbert County · Georgia · United States
- Operating capacity
- 300 MW
- Units
- 1
- Online since
- 1985
- Age
- 41 yrs
Richard B. Russell hydroelectric plant is a 300 MW hydropower plant in Elberton, Georgia, United States.
It has been operating since 1985. It is a conventional storage plant on the Savannah River. It is owned mainly by US Army Corps of Engineers - Savannah District. By capacity it is the 65th largest of 1,436 operating hydropower plants in the United States.
- Owner
- US Army Corps of Engineers - Savannah District
US Army Corps of Engineers - Savannah District [100%]
- Operator
- US Army Corps of Engineers - Savannah District
- Coordinates
- 34.0256, -82.5953 (exact)
- GEM plant ID
- L100000603906
Plant details
How this hydropower plant is built and run.
- Type
- Conventional storage
- River
- Savannah River
- Turbines
- 4 x 75 MW
- Complex
- Richard B. Russell Complex
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 500 GWh
- Capacity factor
- 19%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 435.89 | 1,757.64 | 17% | HYDRO-V1 |
| 2014 | 350.21 | 1,581.81 | 13% | HYDRO-V1 |
| 2015 | 250.36 | 1,264.06 | 10% | HYDRO-V1 |
| 2016 | 310.35 | 1,637.01 | 12% | HYDRO-V1 |
| 2017 | 108.61 | 1,362.15 | 4% | HYDRO-V1 |
| 2018 | 442.70 | — | 17% | — |
| 2019 | 499.59 | — | 19% | — |
How it compares
Size among operating hydropower plants.
- Age
- 41 yrs
Country average for hydropower: 71 yrs
4.2× the average hydropower plant in the United States. About 7% of the size of the largest.
FAQ
About Richard B. Russell hydroelectric plant.
Who owns Richard B. Russell hydroelectric plant?
Its main owner is US Army Corps of Engineers - Savannah District.
How big is Richard B. Russell hydroelectric plant?
It has 300 MW of operating capacity. That makes it the 65th largest hydropower plant in the United States and the 910th largest in the world.
Where is Richard B. Russell hydroelectric plant?
In Elberton, Elbert County, Georgia, United States, at 34.0256, -82.5953.
When was Richard B. Russell hydroelectric plant built?
It started operating in 1985.
Which river is Richard B. Russell hydroelectric plant on?
The Savannah River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0006132
- GEM plant IDL100000603906
- WEPP ID35590
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.