All plants / Indonesia / Jawa
PLN Paiton power station
Bhinor · Paiton · Probolinggo · Jawa · Indonesia
- Operating capacity
- 800 MW
- Units
- 2
- Online since
- 1993
- CO₂ a year
- 5.3 Mt
PLN Paiton power station is an 800 MW coal power plant in Bhinor, Jawa, Indonesia.
It has 2 units, which came online between 1993 and 1994. Its boilers are subcritical, burning subbituminous coal. It is owned mainly by PT PLN Nusantara Power PT. Traced to the top of the ownership chain, its largest owner is Government of Indonesia (100%). Global Energy Monitor estimates it emits about 5.3 million tonnes of CO₂ a year. By capacity it is the 21st largest of 121 operating coal plants in Indonesia. Its last operating unit is due to retire in 2030.
- Owner
- PT PLN Nusantara Power PT
PT PLN Nusantara Power PT [100%]
- Parent company
- PT PLN (Persero) [100.0%]
- Coordinates
- -7.7147, 113.5850 (exact)
- GEM plant ID
- L100000102731
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical
- Coal type
- Subbituminous
- Coal source
- Domestic
- Alternate fuel
- Bioenergy
- State ownership
- 100% · full state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 5.34 Mt
- CO₂ over remaining life
- 16 Mt
- Capacity factor
- 64%
- Efficiency
- 29%
Million tonnes, operating units
Up to 4 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 11,748 Btu/kWh
Retirement and national pledges
- Planned retirement
- 2030in 4 years
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
The planned retirement comes before the country’s net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- PT PLN Nusantara Power Company100%
Ownership chain
- Government of Indonesia Governmentowns 100% of PT PLN (Persero)
- PT PLN (Persero) Companyowns 100% of PT PLN Nusantara Power
- PT PLN Nusantara Power Companyowns 100% of this plant
Ultimately owned by
- Government of Indonesia Government100%
At least 100% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
2 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 2 | 400 MW | Operating | 1993 | — | Subcritical | Subbituminous | 2.67 Mt |
| Unit 1 | 400 MW | Operating | 1994 | 2030 planned | Subcritical | Subbituminous | 2.67 Mt |
How it compares
Size among operating coal plants.
- In Asia
- 748th
- Age
- 33 yrs
of 1,872
Country average for coal: 13 yrs
1.5× the average coal plant in Indonesia. About 13% of the size of the largest.
FAQ
About PLN Paiton power station.
Who owns PLN Paiton power station?
Its main owner is PT PLN Nusantara Power PT. Traced to the top of each ownership chain, its owners are Government of Indonesia (100%).
How big is PLN Paiton power station?
It has 800 MW of operating capacity across 2 units. That makes it the 21st largest coal plant in Indonesia and the 937th largest in the world.
Where is PLN Paiton power station?
In Bhinor, Paiton, Probolinggo, Jawa, Indonesia, at -7.7147, 113.5850.
When was PLN Paiton power station built?
Its first unit started in 1993 and its newest in 1994.
How much CO₂ does PLN Paiton power station emit?
Global Energy Monitor estimates about 5.3 million tonnes of CO₂ a year, and 16 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000102731
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.