Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Indonesia / Jawa

Cilacap Sumber power station

CoalOperatingSubcritical, supercritical, ultra-supercritical

Karangkandri · Kesugihan · Cilacap · Jawa · Indonesia

Operating capacity
2.3 GW
Units
4
Online since
2006
CO₂ a year
12.0 Mt

Cilacap Sumber power station is a 2.3 GW coal power plant in Karangkandri, Jawa, Indonesia.

It has 4 units, which came online between 2006 and 2019. Its boilers are ultra-supercritical, burning subbituminous coal. It is owned mainly by PT Sumber Segara Primadaya. Traced to the top of the ownership chain, its largest owner is PT Sumberenergy Sakti Prima (51%). Global Energy Monitor estimates it emits about 12.0 million tonnes of CO₂ a year. By capacity it is the 5th largest of 121 operating coal plants in Indonesia.

Owner
PT Sumber Segara Primadaya

PT Sumber Segara Primadaya [100%]

Parent company
PT Sumberenergy Sakti Prima [51.0%]; PT PLN (Persero) [49.0%]
Coordinates
-7.6858, 109.0898 (exact)
GEM plant ID
L100000102711

Plant details

How this coal plant is built and run.

Combustion technology
Ultra-supercritical, supercritical, subcritical
Coal type
Subbituminous
Coal source
Domestic
State ownership
49% · partial state-owned enterprise

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
12.03 Mt

Million tonnes, operating units

CO₂ over remaining life
276 Mt

Up to 28 more years of operation

Capacity factor
64%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
36%

From a heat rate of 9,365 Btu/kWh

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2060in 34 years

No retirement date has been announced, so nothing yet ties the plant to Indonesia’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. PT Sumberenergy Sakti Prima Companyowns 51% of PT Sumber Segara Primadaya
  2. PT Sumber Segara Primadaya Companyowns 100% of this plant

Ultimately owned by

At least 49% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

4 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Phase I Unit 1 300 MW Operating 2006—SubcriticalSubbituminous1.93 Mt
Phase I Unit 2 300 MW Operating 2006—SubcriticalSubbituminous1.93 Mt
Phase II Unit 3 660 MW Operating 2016—SupercriticalSubbituminous3.47 Mt
Phase III Unit 4 1.0 GW Operating 2019—Ultra-supercriticalSubbituminous4.70 Mt

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
6.9 TWh

Estimated · 2017

Capacity factor
35%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 6,856.89 35% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating coal plants.

In Indonesia
5th

of 121 coal plants · see all

In Asia
188th

of 1,872

In the world
227th

of 2,643 · largest coal plants

Age
20 yrs

Country average for coal: 13 yrs

This plantCilacap Sumber power station
2.3 GW
Average coal plantIn Indonesia, across 121 plants
518 MW
Largest in IndonesiaBanten Suralaya power station
6.0 GW

4.4× the average coal plant in Indonesia. About 38% of the size of the largest.

FAQ

About Cilacap Sumber power station.

Who owns Cilacap Sumber power station?

Its main owner is PT Sumber Segara Primadaya. Traced to the top of each ownership chain, its owners are PT Sumberenergy Sakti Prima (51%) and Government of Indonesia (49%).

How big is Cilacap Sumber power station?

It has 2.3 GW of operating capacity across 4 units. That makes it the 5th largest coal plant in Indonesia and the 227th largest in the world.

Where is Cilacap Sumber power station?

In Karangkandri, Kesugihan, Cilacap, Jawa, Indonesia, at -7.6858, 109.0898.

When was Cilacap Sumber power station built?

Its first unit started in 2006 and its newest in 2019.

How much CO₂ does Cilacap Sumber power station emit?

Global Energy Monitor estimates about 12.0 million tonnes of CO₂ a year, and 276 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.