CoalOperatingSubcritical, supercritical

Pljevlja · Montenegro

Operating capacity
225 MW
Units
2
Online since
1982
CO₂ a year
0.8 Mt

Pljevlja power station is a 225 MW coal power plant in Pljevlja, Montenegro.

It has 2 units, online since 1982. Its boilers are supercritical, burning lignite coal. It is owned mainly by Elektroprivreda Crne Gore AD. Traced to the top of the ownership chain, its largest owner is Government of Montenegro (55%). Global Energy Monitor estimates it emits about 0.8 million tonnes of CO₂ a year. Its last operating unit is due to retire in 2040.

Owner
Elektroprivreda Crne Gore AD

Elektroprivreda Crne Gore AD [100%]

Parent company
Elektroprivreda Crne Gore AD [100.0%]
Coordinates
43.3346, 19.3271 (exact)
GEM plant ID
L100000103049

Plant details

How this coal plant is built and run.

Combustion technology
Supercritical, subcritical
Coal type
Lignite
Coal source
Domestic · minemouth (next to the mine)
Coal supply notes
Sumani I, Potrlica
State ownership
77% · partial state-owned enterprise

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
0.80 Mt

Million tonnes, operating units

CO₂ over remaining life
11 Mt

Up to 14 more years of operation

Capacity factor
30%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
27%

From a heat rate of 12,618 Btu/kWh

Retirement and national pledges

Planned retirement
2040in 14 years
Coal phase-out pledge
2041in 15 years
Net-zero target
2050in 24 years

The planned retirement comes 1 years before Montenegro’s coal phase-out date. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. Government of Montenegro Governmentowns 55% of Elektroprivreda Crne Gore
  2. Elektroprivreda Crne Gore Companyowns 100% of this plant

Ultimately owned by

At least 76.9% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

2 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 1 225 MW Operating 19822040 plannedSubcriticalLignite0.80 Mt
Unit 2 254 MW Cancelled 2019—SupercriticalLignite—

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
1.3 TWh

Reported · 2017

Capacity factor
64%

Output as a share of running at full power all year

Reported by
JRC-PPDB-OPEN
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 1,215.01 — 62% NO-ESTIMATION
2017 1,264.60 1,322.65 64% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

FAQ

About Pljevlja power station.

Who owns Pljevlja power station?

Its main owner is Elektroprivreda Crne Gore AD. Traced to the top of each ownership chain, its owners are Government of Montenegro (55%), Municipality of Brescia (11%) and Municipality of Milan (11%).

How big is Pljevlja power station?

It has 225 MW of operating capacity across 2 units.

Where is Pljevlja power station?

In Pljevlja, Montenegro, at 43.3346, 19.3271.

When was Pljevlja power station built?

It started operating in 1982.

How much CO₂ does Pljevlja power station emit?

Global Energy Monitor estimates about 0.8 million tonnes of CO₂ a year, and 11 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.