Elektroprivreda Crne Gore

Elektroprivreda Crne Gore AD

Website ↗
Owned operating capacity
225 MW
Operating plants
1
In development
400 MW
Countries
1
Global rank
#5,557

Elektroprivreda Crne Gore is recorded by Global Energy Monitor as a company headquartered in Montenegro, listed on a stock exchange. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 225 MW at 1 plant in 1 country, ranking #5,557 of 13,356 owners on this site. All of it is coal. Its largest holding is Pljevlja power station in Montenegro, where its share of 100% equals 225 MW. A further 400 MW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 44 years.

Fleet at a glance

Owned capacity by status, fuel and country.

By status

  • Operating225 MW26%
  • Announced400 MW46%
  • Cancelled254 MW29%

Operating, by fuel

  • Coal225 MW100%

Operating, by country

Map

1 operating plant with a stake held by Elektroprivreda Crne Gore.

Compared with peers

Largest company owners worldwide, by owned operating capacity.

Ownership structure

Who owns Elektroprivreda Crne Gore, and what it owns.

Owned by

Power plants

4 plants with a stake, largest owned capacity first.

PlantCountryFuelStatusOwned shareOwned operatingPlant operating
Pljevlja power stationPljevlja Montenegro Coal Operating 100% 225 MW 225 MW
Pljevlja gas power stationPljevlja Montenegro Gas Announced 100% — 200 MW planned
Podgorica power stationPodgorica Montenegro Gas Announced 100% — 150 MW planned
EPCG Bar power stationBar Montenegro Gas Announced 100% — 50 MW planned

Pipeline

Units under construction, in pre-construction or announced.

UnitCountryFuelStatusPlanned startOwnedUnit size
Pljevlja gas power station1 Montenegro GasAnnounced — 200 MW200 MW
Podgorica power station1 Montenegro GasAnnounced — 150 MW150 MW
EPCG Bar power station1 Montenegro GasAnnounced — 50 MW50 MW

Facts

Name
Elektroprivreda Crne Gore
Full name
Elektroprivreda Crne Gore AD
Abbreviation
EPCG
Other names
Elektroprivreda Crne Gore AD Nikšić
Type
Company
Legal form
AD
Publicly listed
Yes
Headquarters
Nikšić, Montenegro
Registered in
Montenegro
Website
epcg.com
Legal Entity Identifier
not found
PermID
5000670914
GEM entity ID
E100000001465

Questions

How much power plant capacity does Elektroprivreda Crne Gore own?

Weighted by its ownership share, Elektroprivreda Crne Gore owns 225 MW of operating coal, oil and gas and bioenergy capacity at 1 plants in 1 countries. A further 400 MW is in development and 0.0 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.

What is Elektroprivreda Crne Gore’s largest power plant?

Pljevlja power station in Montenegro is its largest holding by owned operating capacity (225 MW, a 100% share).

Who owns Elektroprivreda Crne Gore?

Global Energy Monitor records 3 direct owners: Government of Montenegro (55%); A2A (43.7%); small shareholder(s) (1.3%).

Is Elektroprivreda Crne Gore building new power plants?

Yes. Its share of units under construction, in pre-construction or announced is 400 MW, including 0.0 MW under construction.

Which fuels do Elektroprivreda Crne Gore’s power plants use?

coal 100% of its owned operating capacity.

How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.