- Operating capacity
- 179 MW
- Units
- 2
- Online since
- 2017
- Age
- 9 yrs
Playa Solar 1 is a 179 MW solar power plant in Clark County, Nevada, United States.
It has 2 units, online since 2017. It is owned mainly by EDF Renewables. By capacity it is the 229th largest of 6,708 operating solar plants in the United States.
- Owner
- EDF Renewables
EDF Renewables [100%]
- Operator
- EDF Renewables
- Coordinates
- 36.4080, -114.9080 (exact)
- GEM plant ID
- L100000804434
Plant details
How this solar plant is built and run.
- Technology
- PV
- Capacity rating
- MWac (grid-connection AC capacity)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1 | 79 MW | Operating | 2017 | PV |
| 2 | 100 MW | Operating | 2017 | PV |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 208 GWh
- Capacity factor
- 13%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | 138.35 | 128.73 | 9% | CAPACITY-FACTOR-V1 |
| 2018 | 214.56 | — | 14% | — |
| 2019 | 208.12 | — | 13% | — |
How it compares
Size among operating solar plants.
- In Americas
- 314th
- Age
- 9 yrs
of 11,032
Country average for solar: 7 yrs
7.7× the average solar plant in the United States. About 19% of the size of the largest.
FAQ
About Playa Solar 1.
Who owns Playa Solar 1?
Its main owner is EDF Renewables.
How big is Playa Solar 1?
It has 179 MW of operating capacity across 2 units. That makes it the 229th largest solar plant in the United States and the 1,384th largest in the world.
Where is Playa Solar 1?
In Clark County, Nevada, United States, at 36.4080, -114.9080.
When was Playa Solar 1 built?
It started operating in 2017.
How much electricity does Playa Solar 1 generate?
It reported 208 GWh in 2019, a capacity factor of 13%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0059827
- GEM plant IDL100000804434
- EIA plant ID59827
- EIA plant ID60261
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.