- Operating capacity
- 255 MW
- Units
- 10
- Online since
- 2014
- Age
- 12 yrs
Copper Mountain Solar 3 is a 255 MW solar power plant in Clark County, Nevada, United States.
It has 10 units, which came online between 2014 and 2015. It is owned mainly by Consolidated Edison Development Inc. By capacity it is the 104th largest of 6,708 operating solar plants in the United States.
- Owner
- Consolidated Edison Development Inc.
Consolidated Edison Development Inc. [100%]
- Operator
- Consolidated Edison Development Inc.
- Coordinates
- 35.8894, -114.9579 (exact)
- GEM plant ID
- L100000804295
Plant details
How this solar plant is built and run.
- Technology
- PV
- Capacity rating
- MWac (grid-connection AC capacity)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
10 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1 | 26 MW | Operating | 2014 | PV |
| 2 | 27 MW | Operating | 2014 | PV |
| 3 | 26 MW | Operating | 2014 | PV |
| 4 | 28 MW | Operating | 2014 | PV |
| 5 | 25 MW | Operating | 2014 | PV |
| 6 | 26 MW | Operating | 2014 | PV |
| 7 | 26 MW | Operating | 2014 | PV |
| 8 | 26 MW | Operating | 2014 | PV |
| 10 | 24 MW | Operating | 2015 | PV |
| 9 | 21 MW | Operating | 2015 | PV |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 592 GWh
- Capacity factor
- 27%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | 155.29 | — | 7% | NO-ESTIMATION |
| 2015 | 602.43 | 593.72 | 27% | SOLAR-V1 |
| 2016 | 605.85 | 544.36 | 27% | SOLAR-V1 |
| 2017 | 607.76 | 681.62 | 27% | SOLAR-V1 |
| 2018 | 613.87 | — | 27% | — |
| 2019 | 592.15 | — | 27% | — |
How it compares
Size among operating solar plants.
- In Americas
- 151st
- Age
- 12 yrs
of 11,032
Country average for solar: 7 yrs
11× the average solar plant in the United States. About 27% of the size of the largest.
FAQ
About Copper Mountain Solar 3.
Who owns Copper Mountain Solar 3?
Its main owner is Consolidated Edison Development Inc.
How big is Copper Mountain Solar 3?
It has 255 MW of operating capacity across 10 units. That makes it the 104th largest solar plant in the United States and the 736th largest in the world.
Where is Copper Mountain Solar 3?
In Clark County, Nevada, United States, at 35.8894, -114.9579.
When was Copper Mountain Solar 3 built?
Its first unit started in 2014 and its newest in 2015.
How much electricity does Copper Mountain Solar 3 generate?
It reported 592 GWh in 2019, a capacity factor of 27%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0058915
- GEM plant IDL100000804295
- WEPP ID58550
- EIA plant ID58915
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.