China Energy Engineering Group
China Energy Engineering Group Co Ltd
中国能源建设集团有限公司
- Owned operating capacity
- 1.9 GW
- Operating plants
- 12
- In development
- 1.9 GW
- Countries
- 1
- Global rank
- #1,177
China Energy Engineering Group is recorded by Global Energy Monitor as a company headquartered in China. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 1.9 GW at 12 plants in 1 country, ranking #1,177 of 13,356 owners on this site. 86% of that is coal, followed by gas (9%). Its largest holding is CEEC Chongzuo power station in China, where its share of 44.8% equals 591 MW. The biggest part is held through China Energy Engineering (about 1.9 GW). A further 1.9 GW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 4 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating1.9 GW28%
- Under construction435 MW6%
- Pre-construction1.3 GW19%
- Announced122 MW2%
- Shelved820 MW12%
- Retired11 MW0.2%
- Cancelled2.3 GW33%
Operating, by fuel
Operating, by country
Operating capacity by decade it started · average age 4 years
Map
12 operating plants with a stake held by China Energy Engineering Group.
Compared with peers
Largest company owners in China, by owned operating capacity.
Ownership structure
Who owns China Energy Engineering Group, and what it owns.
Owned by
GEM records no owner above China Energy Engineering Group in this release, so it is treated as the top of its ownership chain.
Owns 1 company
- China Energy Engineering 4.3 GW operating44.8%
Power plants
17 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| CEEC Chongzuo power stationGuangxi · indirect | China | Coal | Operating | 44.8% | 591 MW | 1.3 GW |
| Fangchenggang Qisha power stationGuangxi · indirect | China | Coal | Operating | 13.4% | 347 MW | 2.6 GW |
| Shenhua Qingyuan power stationGuangdong · indirect | China | Coal | Operating | 8.5% | 340 MW | 4.0 GW |
| Liupanshui Dawan Waste Coal power stationGuizhou · indirect | China | Coal | Operating | 44.8% | 296 MW | 660 MW |
| Huadian Zengcheng Gas Thermal power stationGuangdong · indirect | China | Gas | Operating | 6.7% | 90 MW | 1.3 GW |
| Shanggao power stationJiangxi · indirect | China | Coal | Operating | 4.5% | 90 MW | 2.0 GW |
| Chuantou Luzhou power stationSichuan · indirect | China | Gas | Operating | 4.5% | 63 MW | 1.4 GW |
| Heilongjiang Zhaodong (China Energy Construction Investment) power stationHeilongjiang · indirect | China | Biomass | Operating | 44.8% | 36 MW | 80 MW |
| Sichuan Deyang Zhongjiang power stationSichuan · indirect | China | Gas | Operating | 4.5% | 31 MW | 700 MW |
| Heilongjiang Suihua Beilin power stationHeilongjiang · indirect | China | Biomass | Operating | 35.8% | 29 MW | 80 MW |
| Liaoning Qingyuan power stationLiaoning · indirect | China | Biomass | Operating | 44.8% | 18 MW | 40 MW |
| Gansu Huating power stationGansu · indirect | China | Coal | Operating | 4.5% | 13 MW | 290 MW |
| Bijie Qianxi power stationGuizhou | China | Coal | Pre-construction | 100% | — | 1.3 GW planned |
| Parit Baru power stationKalimantan · indirect | Indonesia | Coal | Under construction | 17.9% | — | 100 MW planned |
| Kamwamba power stationNtcheu · indirect | Malawi | Coal | Pre-construction | 5.4% | — | 300 MW planned |
| Guangxi Xing'An power stationGuangxi · indirect | China | Biomass | Shelved | 44.8% | — | 30 MW planned |
| Ruiming power stationGuangdong · indirect | China | Coal | Retired | 4.5% | — | 250 MW planned |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| Liupanshui Dawan Waste Coal power stationUnit 2 | China | Coal | Under construction | 2025 | 296 MW | 660 MW |
| Shanggao power stationPhase II Unit 4 | China | Coal | Under construction | — | 45 MW | 1.0 GW |
| Shanggao power stationPhase II Unit 3 | China | Coal | Under construction | — | 45 MW | 1.0 GW |
| Sichuan Deyang Zhongjiang power station1-2 | China | Gas | Under construction | 2026 | 31 MW | 700 MW |
| Parit Baru power stationUnit 2 | Indonesia | Coal | Under construction | 2033 | 9.0 MW | 50 MW |
| Parit Baru power stationUnit 1 | Indonesia | Coal | Under construction | 2033 | 9.0 MW | 50 MW |
| Bijie Qianxi power stationUnit 1 | China | Coal | Pre-construction | — | 660 MW | 660 MW |
| Bijie Qianxi power stationUnit 2 | China | Coal | Pre-construction | — | 660 MW | 660 MW |
| Kamwamba power stationUnit 2 | Malawi | Coal | Pre-construction | 2030 | 2.7 MW | 50 MW |
| Kamwamba power stationUnit 5 | Malawi | Coal | Pre-construction | 2030 | 2.7 MW | 50 MW |
| Kamwamba power stationUnit 3 | Malawi | Coal | Pre-construction | 2030 | 2.7 MW | 50 MW |
| Kamwamba power stationUnit 6 | Malawi | Coal | Pre-construction | 2030 | 2.7 MW | 50 MW |
| Kamwamba power stationUnit 1 | Malawi | Coal | Pre-construction | 2030 | 2.7 MW | 50 MW |
| Kamwamba power stationUnit 4 | Malawi | Coal | Pre-construction | 2030 | 2.7 MW | 50 MW |
| Sichuan Deyang Zhongjiang power station2-1 | China | Gas | Announced | — | 31 MW | 700 MW |
| Sichuan Deyang Zhongjiang power station2-2 | China | Gas | Announced | — | 31 MW | 700 MW |
| Gansu Huating power stationPhase II Unit 3 | China | Coal | Announced | — | 30 MW | 660 MW |
| Gansu Huating power stationPhase II Unit 4 | China | Coal | Announced | — | 30 MW | 660 MW |
Facts
- Name
- China Energy Engineering Group
- Full name
- China Energy Engineering Group Co Ltd
- Local name
- 中国能源建设集团有限公司
- Type
- Company
- Legal form
- Co Ltd
- Publicly listed
- No
- Headquarters
- Beijing Shi, China
- Registered in
- China
- Legal Entity Identifier
- 300300THUGPRWG7AHL68
- PermID
- 5037838116
- GEM entity ID
- E100001010848
Questions
How much power plant capacity does China Energy Engineering Group own?
Weighted by its ownership share, China Energy Engineering Group owns 1.9 GW of operating coal, oil and gas and bioenergy capacity at 12 plants in 1 countries. A further 1.9 GW is in development and 11 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is China Energy Engineering Group’s largest power plant?
CEEC Chongzuo power station in China is its largest holding by owned operating capacity (591 MW, a 44.8% share).
Who owns China Energy Engineering Group?
Global Energy Monitor records no owner above China Energy Engineering Group in this release.
Is China Energy Engineering Group building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 1.9 GW, including 435 MW under construction.
Which fuels do China Energy Engineering Group’s power plants use?
coal 86%, gas 9%, bioenergy 4% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.