Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / China / Shandong

Huaneng Jining Gaoxin cogen power station

华能济宁高新区热电

CoalOperatingSupercritical, unknown

Sunshidian Village · Yanzhou District · Jining · Shandong · China

Operating capacity
700 MW
Units
4
Online since
2021
CO₂ a year
3.0 Mt

Huaneng Jining Gaoxin cogen power station is a 700 MW coal power plant in Sunshidian Village, Shandong, China.

It has 4 units, which came online between 2004 and 2021. Its boilers are supercritical. It is owned mainly by Jining Huayuan Thermal Power Co Ltd. Traced to the top of the ownership chain, its largest owner is State-owned Assets Supervision and Administration Commission of Jining Municipal People's Government (50%). Global Energy Monitor estimates it emits about 3.0 million tonnes of CO₂ a year. By capacity it is the 530th largest of 1,225 operating coal plants in China.

Owner
Jining Huayuan Thermal Power Co Ltd

Jining Huayuan Thermal Power Co Ltd [100%]

Parent company
Jining Water Supply Group General Co [50.0%]; Huaneng Power International Inc [40.0%]; China Huaneng Group Co Ltd [10.0%]
Retired
60 MW (last in 2023)
Coordinates
35.4687, 116.7057 (exact)
GEM plant ID
L100000101361

Plant details

How this coal plant is built and run.

Combustion technology
Supercritical
Coal source
Domestic · minemouth (next to the mine)
Combined heat and power
Yes
Permit
August 26, 2015
State ownership
46% · partial state-owned enterprise

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
2.99 Mt

Million tonnes, operating units

CO₂ over remaining life
90 Mt

Up to 30 more years of operation

Capacity factor
52%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
37%

From a heat rate of 9,250 Btu/kWh

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2060in 34 years

No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. Huaneng Power International Companyowns 80% of Huaneng Shandong Power Generation
  2. Huaneng Shandong Power Generation Companyowns 50% of Jining Huayuan Thermal Power
  3. Jining Huayuan Thermal Power Companyowns 100% of this plant

Ultimately owned by

At least 50% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

4 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 1 30 MW Retired 20042023———
Unit 2 30 MW Retired 20042023———
Unit 3 350 MW Operating 2021—Supercritical—1.50 Mt
Unit 4 350 MW Operating 2021—Supercritical—1.50 Mt

How it compares

Size among operating coal plants.

In China
530th

of 1,225 coal plants · see all

In Asia
772nd

of 1,872

In the world
982nd

of 2,643 · largest coal plants

Age
5 yrs

Country average for coal: 16 yrs

This plantHuaneng Jining Gaoxin cogen power station
700 MW
Average coal plantIn China, across 1,225 plants
1.0 GW
Largest in ChinaBeilun power station
7.1 GW

67% of the average coal plant in China. About 10% of the size of the largest.

FAQ

About Huaneng Jining Gaoxin cogen power station.

Who owns Huaneng Jining Gaoxin cogen power station?

Its main owner is Jining Huayuan Thermal Power Co Ltd. Traced to the top of each ownership chain, its owners are State-owned Assets Supervision and Administration Commission of Jining Municipal People's Government (50%), Huaneng Power International (40%) and China Huaneng Group (10%).

How big is Huaneng Jining Gaoxin cogen power station?

It has 700 MW of operating capacity across 4 units. That makes it the 530th largest coal plant in China and the 982nd largest in the world.

Where is Huaneng Jining Gaoxin cogen power station?

In Sunshidian Village, Yanzhou District, Jining, Shandong, China, at 35.4687, 116.7057.

When was Huaneng Jining Gaoxin cogen power station built?

Its first unit started in 2004 and its newest in 2021.

How much CO₂ does Huaneng Jining Gaoxin cogen power station emit?

Global Energy Monitor estimates about 3.0 million tonnes of CO₂ a year, and 90 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.