All plants / China / Guangdong
Guangdong Shaoguan power station
粤电粤江发电公司韶关发电厂
Wushi Town · Qujiang · Shaoguan · Guangdong · China
- Operating capacity
- 1.9 GW
- Units
- 10
- Online since
- 2005
- CO₂ a year
- 8.7 Mt
Guangdong Shaoguan power station is a 1.9 GW coal power plant in Wushi Town, Guangdong, China.
It has 10 units, which came online between 1966 and 2015. Its boilers are subcritical, burning anthracite coal. It is owned mainly by Guangdong Shaoguan Yuejiang Electricity Generation Co Ltd. Traced to the top of the ownership chain, its largest owner is Guangdong Electric Power Development (90%). Global Energy Monitor estimates it emits about 8.7 million tonnes of CO₂ a year. By capacity it is the 212th largest of 1,225 operating coal plants in China.
- Owner
- Guangdong Shaoguan Yuejiang Electricity Generation Co Ltd
Guangdong Shaoguan Yuejiang Electricity Generation Co Ltd [100%]
- Parent company
- Guangdong Electric Power Development Co Ltd [90.0%]; Public Assets Management Center of Qujiang District, Shaoguan City [10.0%]
- Retired
- 600 MW (last in 2009)
- Coordinates
- 24.5857, 113.5829 (exact)
- GEM plant ID
- L100000100361
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical, ultra-supercritical
- Coal type
- Anthracite
- Coal source
- Domestic/imported
- Permit
- December 1, 2013
- Alternate fuel
- Bioenergy
- State ownership
- 10% · partial state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 8.69 Mt
- CO₂ over remaining life
- 171 Mt
- Capacity factor
- 52%
- Efficiency
- 35%
Million tonnes, operating units
Up to 24 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 9,885 Btu/kWh
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
Ownership chain
- Guangdong Electric Power Development Companyowns 90% of Guangdong Shaoguan Yuejiang Electricity Generation
- Guangdong Shaoguan Yuejiang Electricity Generation Companyowns 100% of this plant
Ultimately owned by
- Guangdong Electric Power Development Company90%
- Public Assets Management Center of Qujiang District, Shaoguan City Government10%
At least 10% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
10 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Shaoguan-1 Unit 3 | 50 MW | Retired | 1966 | 2006 | Subcritical | Anthracite | — |
| Shaoguan-1 Unit 4 | 50 MW | Retired | 1967 | 2007 | Subcritical | Anthracite | — |
| Shaoguan-1 Unit 5 | 50 MW | Retired | 1972 | 2007 | Subcritical | Anthracite | — |
| Shaoguan-1 Unit 6 | 50 MW | Retired | 1973 | 2007 | Subcritical | Anthracite | — |
| Shaoguan-1 Unit 7 | 200 MW | Retired | 1985 | 2009 | Subcritical | Anthracite | — |
| Shaoguan-1 Unit 8 | 200 MW | Retired | 1990 | 2009 | Subcritical | Anthracite | — |
| Shaoguan-1 Unit 10 | 330 MW | Operating | 2005 | — | Subcritical | Anthracite | 1.76 Mt |
| Shaoguan-1 Unit 11 | 330 MW | Operating | 2005 | — | Subcritical | Anthracite | 1.76 Mt |
| Shaoguan-2 Unit 1 | 600 MW | Operating | 2014 | — | Ultra-supercritical | Anthracite | 2.58 Mt |
| Shaoguan-2 Unit 2 | 600 MW | Operating | 2015 | — | Ultra-supercritical | Anthracite | 2.58 Mt |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 8.8 TWh
- Capacity factor
- 54%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 8,770.84 | 54% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating coal plants.
- In Asia
- 302nd
- Age
- 21 yrs
of 1,872
Country average for coal: 16 yrs
1.8× the average coal plant in China. About 26% of the size of the largest.
FAQ
About Guangdong Shaoguan power station.
Who owns Guangdong Shaoguan power station?
Its main owner is Guangdong Shaoguan Yuejiang Electricity Generation Co Ltd. Traced to the top of each ownership chain, its owners are Guangdong Electric Power Development (90%) and Public Assets Management Center of Qujiang District, Shaoguan City (10%).
How big is Guangdong Shaoguan power station?
It has 1.9 GW of operating capacity across 10 units. That makes it the 212th largest coal plant in China and the 362nd largest in the world.
Where is Guangdong Shaoguan power station?
In Wushi Town, Qujiang, Shaoguan, Guangdong, China, at 24.5857, 113.5829.
When was Guangdong Shaoguan power station built?
Its first unit started in 1966 and its newest in 2015.
How much CO₂ does Guangdong Shaoguan power station emit?
Global Energy Monitor estimates about 8.7 million tonnes of CO₂ a year, and 171 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1070082
- GEM plant IDL100000100361
- WEPP ID1071984|1082331