Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Brazil / Rio Grande do Norte

Eurus 2 wind farm

Eurus 2

WindOperatingOnshore

João Câmara · Região Geográfica Intermediária de Natal · Rio Grande do Norte · Brazil

Operating capacity
30 MW
Units
1
Online since
2015
Age
11 yrs

Eurus 2 wind farm is a 30 MW wind power plant in João Câmara, Rio Grande do Norte, Brazil.

It has been operating since 2015. It is owned mainly by CGN Brasil Energia. By capacity it is the 217th largest of 480 operating wind plants in Brazil.

Owner
CGN Brasil Energia

CGN Brasil Energia [100%]

Operator
CGN Brasil Energia
Coordinates
-5.3919, -35.8331 (exact)
GEM plant ID
L100000905070

Plant details

How this wind plant is built and run.

Installation
Onshore

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
115 GWh

Estimated · 2017

Capacity factor
44%

Output as a share of running at full power all year

Estimation method
Wind model
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — 117.04 45% WIND-V1
2017 — 115.16 44% WIND-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating wind plants.

In Brazil
217th

of 480 wind plants · see all

In Americas
1,310th

of 1,910

In the world
9,413th

of 17,121 · largest wind plants

Age
11 yrs

Country average for wind: 10 yrs

This plantEurus 2 wind farm
30 MW
Average wind plantIn Brazil, across 480 plants
87 MW
828 MW

35% of the average wind plant in Brazil. About 4% of the size of the largest.

FAQ

About Eurus 2 wind farm.

Who owns Eurus 2 wind farm?

Its main owner is CGN Brasil Energia.

How big is Eurus 2 wind farm?

It has 30 MW of operating capacity. That makes it the 217th largest wind plant in Brazil and the 9,413th largest in the world.

Where is Eurus 2 wind farm?

In João Câmara, Região Geográfica Intermediária de Natal, Rio Grande do Norte, Brazil, at -5.3919, -35.8331.

When was Eurus 2 wind farm built?

It started operating in 2015.

How much electricity does Eurus 2 wind farm generate?

An estimated 115 GWh was generated in 2017, a capacity factor of 44%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · BRA0030499
  • GEM plant IDL100000905070
  • WEPP ID1087425
  • ANEEL unit IDEOL.CV.RN.030499-9

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.