All plants / Brazil / Rio Grande do Norte
Cajuina wind farm
Pedro Avelino · Região Geográfica Intermediária de Natal · Rio Grande do Norte · Brazil
- Operating capacity
- 462 MW
- Units
- 14
- Online since
- 2023
- Age
- 3 yrs
Cajuina wind farm is a 462 MW wind power plant in Pedro Avelino, Rio Grande do Norte, Brazil.
It has 14 units, which came online between 2023 and 2025. It is owned mainly by AES Corp and operated by AES. By capacity it is the 12th largest of 480 operating wind plants in Brazil.
- Owner
- AES Corp
AES Corp [100%]
- Operator
- AES
- In development
- 122 MW
- Coordinates
- -5.6083, -36.2699 (exact)
- GEM plant ID
- L100000904958
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
14 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| Ventos de Santa Tereza 01 | 40 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 02 | 40 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 03 | 46 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 04 | 40 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 05 | 46 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 07 | 68 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 10 | 51 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 13 | 46 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 14 | 46 MW | Operating | 2023 | Onshore |
| Ventos de Santa Tereza 08 | 17 MW | Operating | 2024 | Onshore |
| Ventos de Santa Tereza 12 | 23 MW | Operating | 2025 | Onshore |
| Ventos de Santa Tereza 06 (small unit) | 9.0 MW | Under construction | — | Onshore |
| Ventos de Santa Tereza 09 | 63 MW | Under construction | — | Onshore |
| Ventos de Santa Tereza 11 | 50 MW | Under construction | — | Onshore |
How it compares
Size among operating wind plants.
- In Americas
- 53rd
- Age
- 3 yrs
of 1,910
Country average for wind: 10 yrs
5.3× the average wind plant in Brazil. About 56% of the size of the largest.
FAQ
About Cajuina wind farm.
Who owns Cajuina wind farm?
Its main owner is AES Corp. It is operated by AES.
How big is Cajuina wind farm?
It has 462 MW of operating capacity across 14 units. That makes it the 12th largest wind plant in Brazil and the 247th largest in the world.
Where is Cajuina wind farm?
In Pedro Avelino, Região Geográfica Intermediária de Natal, Rio Grande do Norte, Brazil, at -5.6083, -36.2699.
When was Cajuina wind farm built?
Its first unit started in 2023 and its newest in 2025.
What kind of power plant is Cajuina wind farm?
It is a wind power plant using Onshore technology.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- GEM plant IDL100000904958
- ANEEL unit IDEOL.CV.RN.047198-4
- ANEEL unit IDEOL.CV.RN.047235-2
- ANEEL unit IDEOL.CV.RN.047236-0
- ANEEL unit IDEOL.CV.RN.047237-9
- ANEEL unit IDEOL.CV.RN.047238-7
- ANEEL unit IDEOL.CV.RN.047239-5
- ANEEL unit IDEOL.CV.RN.047240-9
- ANEEL unit IDEOL.CV.RN.047241-7
- ANEEL unit IDEOL.CV.RN.047242-5
- ANEEL unit IDEOL.CV.RN.047243-3
- ANEEL unit IDEOL.CV.RN.047244-1
- ANEEL unit IDEOL.CV.RN.047245-0
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.