All plants / United States / California
Dinosaur Point wind farm
Merced County · California · United States
- Operating capacity
- 17 MW
- Units
- 2
- Online since
- 1988
- Age
- 38 yrs
Dinosaur Point wind farm is a 17 MW wind power plant in Merced County, California, United States.
It has 2 units, online since 1988. It is owned mainly by International Turbine Research. By capacity it is the 1,149th largest of 1,465 operating wind plants in the United States.
- Owner
- International Turbine Research
International Turbine Research [100%]
- In development
- 133 MW (from 2026)
- Coordinates
- 37.0424, -121.1670 (exact)
- GEM plant ID
- L100000906374
Plant details
How this wind plant is built and run.
- Installation
- Onshore
- Battery storage on site
- Yes
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 | 17 MW | Operating | 1988 | Onshore |
| RP1 | 133 MW | Under construction | 2026 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 14 GWh
- Capacity factor
- 9%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 24.82 | 30.66 | 17% | WIND-V1 |
| 2014 | 24.59 | 30.73 | 17% | WIND-V1 |
| 2015 | 27.13 | 20.28 | 18% | WIND-V1 |
| 2016 | — | 26.15 | 18% | WIND-V1 |
| 2017 | 21.03 | 26.23 | 14% | WIND-V1 |
| 2018 | 9.47 | — | 6% | — |
| 2019 | 13.97 | — | 9% | — |
How it compares
Size among operating wind plants.
- In Americas
- 1,496th
- Age
- 38 yrs
of 1,910
Country average for wind: 13 yrs
12% of the average wind plant in the United States. About 2% of the size of the largest.
FAQ
About Dinosaur Point wind farm.
Who owns Dinosaur Point wind farm?
Its main owner is International Turbine Research.
How big is Dinosaur Point wind farm?
It has 17 MW of operating capacity across 2 units. That makes it the 1,149th largest wind plant in the United States and the 12,525th largest in the world.
Where is Dinosaur Point wind farm?
In Merced County, California, United States, at 37.0424, -121.1670.
When was Dinosaur Point wind farm built?
It started operating in 1988.
How much electricity does Dinosaur Point wind farm generate?
It reported 14 GWh in 2019, a capacity factor of 9%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0010005
- GEM plant IDL100000906374
- WEPP ID23224
- EIA plant ID10005
- EIA plant ID68981
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.