All plants / United States / California
Pinyon Pines wind farm
Kern County · California · United States
- Operating capacity
- 300 MW
- Units
- 2
- Online since
- 2012
- Age
- 14 yrs
Pinyon Pines wind farm is a 300 MW wind power plant in Kern County, California, United States.
It has 2 units, online since 2012. It is owned mainly by BHE Renewables LLC and operated by BHE Renewables. By capacity it is the 128th largest of 1,465 operating wind plants in the United States.
- Owner
- BHE Renewables LLC
BHE Renewables LLC [100%]
- Operator
- BHE Renewables
- Coordinates
- 35.0221, -118.2140 (exact)
- GEM plant ID
- L100000907138
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 | 168 MW | Operating | 2012 | Onshore |
| 2.0 | 132 MW | Operating | 2012 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 204 GWh
- Capacity factor
- 8%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 258.49 | 343.73 | 10% | WIND-V1 |
| 2014 | 255.60 | 368.21 | 10% | WIND-V1 |
| 2015 | 202.59 | 362.26 | 8% | WIND-V1 |
| 2016 | 250.44 | 326.87 | 10% | WIND-V1 |
| 2017 | 230.44 | 336.60 | 9% | WIND-V1 |
| 2018 | 244.26 | — | 9% | — |
| 2019 | 203.75 | — | 8% | — |
How it compares
Size among operating wind plants.
- In Americas
- 171st
- Age
- 14 yrs
of 1,910
Country average for wind: 13 yrs
2.2× the average wind plant in the United States. About 27% of the size of the largest.
FAQ
About Pinyon Pines wind farm.
Who owns Pinyon Pines wind farm?
Its main owner is BHE Renewables LLC. It is operated by BHE Renewables.
How big is Pinyon Pines wind farm?
It has 300 MW of operating capacity across 2 units. That makes it the 128th largest wind plant in the United States and the 557th largest in the world.
Where is Pinyon Pines wind farm?
In Kern County, California, United States, at 35.0221, -118.2140.
When was Pinyon Pines wind farm built?
It started operating in 2012.
How much electricity does Pinyon Pines wind farm generate?
It reported 204 GWh in 2019, a capacity factor of 8%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0057837
- GEM plant IDL100000907138
- EIA plant ID57834
- EIA plant ID57837
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.