- Operating capacity
- 48 MW
- Units
- 5
- Online since
- 2010
- Age
- 16 yrs
CM48 solar project is a 48 MW solar power plant in Clark County, Nevada, United States.
It has 5 units, online since 2010. It is owned mainly by Consolidated Edison Development Inc. By capacity it is the 876th largest of 6,708 operating solar plants in the United States.
- Coordinates
- 35.7814, -114.9933 (exact)
- GEM plant ID
- L100001043041
Plant details
How this solar plant is built and run.
- Technology
- PV
- Capacity rating
- MWac (grid-connection AC capacity)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
5 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| PV02 | 8.0 MW | Operating | 2010 | PV |
| PV03 | 10 MW | Operating | 2010 | PV |
| PV04 | 10 MW | Operating | 2010 | PV |
| PV05 | 10 MW | Operating | 2010 | PV |
| PV06 | 10 MW | Operating | 2010 | PV |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 98 GWh
- Capacity factor
- 23%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 105.25 | 100.92 | 25% | SOLAR-V1 |
| 2014 | 103.46 | 101.95 | 25% | SOLAR-V1 |
| 2015 | 101.94 | 89.06 | 24% | SOLAR-V1 |
| 2016 | 98.29 | 90.11 | 23% | SOLAR-V1 |
| 2017 | 101.20 | 109.00 | 24% | SOLAR-V1 |
| 2018 | 100.21 | — | 24% | — |
| 2019 | 97.97 | — | 23% | — |
How it compares
Size among operating solar plants.
- In Americas
- 1,162nd
- Age
- 16 yrs
of 11,032
Country average for solar: 7 yrs
2.1× the average solar plant in the United States. About 5% of the size of the largest.
FAQ
About CM48 solar project.
Who owns CM48 solar project?
Its main owner is Consolidated Edison Development Inc.
How big is CM48 solar project?
It has 48 MW of operating capacity across 5 units. That makes it the 876th largest solar plant in the United States and the 6,168th largest in the world.
Where is CM48 solar project?
In Clark County, Nevada, United States, at 35.7814, -114.9933.
When was CM48 solar project built?
It started operating in 2010.
How much electricity does CM48 solar project generate?
It reported 98 GWh in 2019, a capacity factor of 23%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0057205
- GEM plant IDL100001043041
- EIA plant ID57205
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.