WindOperatingOnshore

Campillo de Altobuey · Cuenca · Castilla-La Mancha · Spain

Operating capacity
259 MW
Units
3
Online since
2022
Age
4 yrs

Campillo De Altobuey wind farm is a 259 MW wind power plant in Campillo de Altobuey, Castilla-La Mancha, Spain.

It has 3 units, online since 2022. It is owned mainly by Enel Green Power SpA and operated by Enel Green Power. By capacity it is the 3rd largest of 939 operating wind plants in Spain.

Owner
Enel Green Power SpA

Enel Green Power SpA [100%]

Operator
Enel Green Power
Coordinates
39.6113, -1.7928 (approximate)
GEM plant ID
L100000915486

Plant details

How this wind plant is built and run.

Installation
Onshore

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Units

3 units at this site.

UnitCapacityStatusStartTechnology
1.0 77 MW Operating 2022Onshore
2.0 91 MW Operating 2022Onshore
3.0 91 MW Operating 2022Onshore

How it compares

Size among operating wind plants.

In Spain
3rd

of 939 wind plants · see all

In Europe
89th

of 7,126

In the world
816th

of 17,121 · largest wind plants

Age
4 yrs

Country average for wind: 18 yrs

This plantCampillo De Altobuey wind farm
259 MW
Average wind plantIn Spain, across 939 plants
36 MW
Largest in SpainLas Majas wind farm
465 MW

7.2× the average wind plant in Spain. About 56% of the size of the largest.

FAQ

About Campillo De Altobuey wind farm.

Who owns Campillo De Altobuey wind farm?

Its main owner is Enel Green Power SpA. It is operated by Enel Green Power.

How big is Campillo De Altobuey wind farm?

It has 259 MW of operating capacity across 3 units. That makes it the 3rd largest wind plant in Spain and the 816th largest in the world.

Where is Campillo De Altobuey wind farm?

In Campillo de Altobuey, Cuenca, Castilla-La Mancha, Spain, at 39.6113, -1.7928.

When was Campillo De Altobuey wind farm built?

It started operating in 2022.

What kind of power plant is Campillo De Altobuey wind farm?

It is a wind power plant using Onshore technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100000915486

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.