Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Spain / Castilla-La Mancha

Callejas wind farm

Parque eólico Callejas

WindOperatingOnshore

Cuenca · Castilla-La Mancha · Spain

Operating capacity
50 MW
Units
1
Online since
2004
Age
22 yrs

Callejas wind farm is a 50 MW wind power plant in Cuenca, Castilla-La Mancha, Spain.

It has been operating since 2004. It is owned mainly by Iberdrola Renovables Energia SA and operated by Iberdrola Energías Renovables Castilla La Mancha. By capacity it is the 85th largest of 939 operating wind plants in Spain.

Owner
Iberdrola Renovables Energia SA

Iberdrola Renovables Energia SA [100%]

Operator
Iberdrola Energías Renovables Castilla La Mancha
Coordinates
39.6330, -1.8131 (exact)
GEM plant ID
L100000914876

Plant details

How this wind plant is built and run.

Installation
Onshore

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
105 GWh

Estimated · 2017

Capacity factor
24%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 105.27 24% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating wind plants.

In Spain
85th

of 939 wind plants · see all

In Europe
831st

of 7,126

In the world
5,199th

of 17,121 · largest wind plants

Age
22 yrs

Country average for wind: 18 yrs

This plantCallejas wind farm
50 MW
Average wind plantIn Spain, across 939 plants
36 MW
Largest in SpainLas Majas wind farm
465 MW

1.4× the average wind plant in Spain. About 11% of the size of the largest.

FAQ

About Callejas wind farm.

Who owns Callejas wind farm?

Its main owner is Iberdrola Renovables Energia SA. It is operated by Iberdrola Energías Renovables Castilla La Mancha.

How big is Callejas wind farm?

It has 50 MW of operating capacity. That makes it the 85th largest wind plant in Spain and the 5,199th largest in the world.

Where is Callejas wind farm?

In Cuenca, Castilla-La Mancha, Spain, at 39.6330, -1.8131.

When was Callejas wind farm built?

It started operating in 2004.

How much electricity does Callejas wind farm generate?

An estimated 105 GWh was generated in 2017, a capacity factor of 24%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1006755
  • GEM plant IDL100000914876
  • WEPP ID1062017
  • World Resources Institute plant IDWRI1006755

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.