All plants / Spain / Castilla-La Mancha
Callejas wind farm
Parque eólico Callejas
Cuenca · Castilla-La Mancha · Spain
- Operating capacity
- 50 MW
- Units
- 1
- Online since
- 2004
- Age
- 22 yrs
Callejas wind farm is a 50 MW wind power plant in Cuenca, Castilla-La Mancha, Spain.
It has been operating since 2004. It is owned mainly by Iberdrola Renovables Energia SA and operated by Iberdrola Energías Renovables Castilla La Mancha. By capacity it is the 85th largest of 939 operating wind plants in Spain.
- Owner
- Iberdrola Renovables Energia SA
Iberdrola Renovables Energia SA [100%]
- Operator
- Iberdrola Energías Renovables Castilla La Mancha
- Coordinates
- 39.6330, -1.8131 (exact)
- GEM plant ID
- L100000914876
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 105 GWh
- Capacity factor
- 24%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 105.27 | 24% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating wind plants.
- In Europe
- 831st
- Age
- 22 yrs
of 7,126
Country average for wind: 18 yrs
1.4× the average wind plant in Spain. About 11% of the size of the largest.
FAQ
About Callejas wind farm.
Who owns Callejas wind farm?
Its main owner is Iberdrola Renovables Energia SA. It is operated by Iberdrola Energías Renovables Castilla La Mancha.
How big is Callejas wind farm?
It has 50 MW of operating capacity. That makes it the 85th largest wind plant in Spain and the 5,199th largest in the world.
Where is Callejas wind farm?
In Cuenca, Castilla-La Mancha, Spain, at 39.6330, -1.8131.
When was Callejas wind farm built?
It started operating in 2004.
How much electricity does Callejas wind farm generate?
An estimated 105 GWh was generated in 2017, a capacity factor of 24%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1006755
- GEM plant IDL100000914876
- WEPP ID1062017
- World Resources Institute plant IDWRI1006755
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.