- Operating capacity
- 24 MW
- Units
- 2
- Online since
- 2002
- Age
- 24 yrs
Cabril wind farm is a 24 MW wind power plant in Viseu, Portugal.
It has 2 units, online since 2002. It is owned mainly by Finerge SA and operated by Eólica da Cabreira. By capacity it is the 66th largest of 234 operating wind plants in Portugal.
- Owner
- Finerge SA
Finerge SA [50%]; Guild Investments Ltd [50%]
- Operator
- Eólica da Cabreira
- Coordinates
- 40.9832, -8.0449 (exact)
- GEM plant ID
- L100000910719
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
2 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 | 20 MW | Operating | 2002 | Onshore |
| Expansion (small unit) | 4.0 MW | Operating | 2002 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 35 GWh
- Capacity factor
- 16%
- Estimation method
- Wind model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 71.57 | 34% | WIND-V1 |
| 2014 | — | 54.54 | 26% | WIND-V1 |
| 2015 | — | 24.78 | 12% | WIND-V1 |
| 2016 | — | 37.54 | 18% | WIND-V1 |
| 2017 | — | 34.56 | 16% | WIND-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating wind plants.
- In Europe
- 2,697th
- Age
- 24 yrs
of 7,126
Country average for wind: 18 yrs
About average for Portugal. About 8% of the size of the largest.
FAQ
About Cabril wind farm.
Who owns Cabril wind farm?
Its main owner is Finerge SA. It is operated by Eólica da Cabreira.
How big is Cabril wind farm?
It has 24 MW of operating capacity across 2 units. That makes it the 66th largest wind plant in Portugal and the 10,669th largest in the world.
Where is Cabril wind farm?
In Viseu, Portugal, at 40.9832, -8.0449.
When was Cabril wind farm built?
It started operating in 2002.
How much electricity does Cabril wind farm generate?
An estimated 35 GWh was generated in 2017, a capacity factor of 16%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1023311
- GEM plant IDL100000910719
- WEPP ID1053518
- World Resources Institute plant IDWRI1023311
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.