Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Portugal

Cabril wind farm

WindOperatingOnshore

Viseu · Portugal

Operating capacity
24 MW
Units
2
Online since
2002
Age
24 yrs

Cabril wind farm is a 24 MW wind power plant in Viseu, Portugal.

It has 2 units, online since 2002. It is owned mainly by Finerge SA and operated by Eólica da Cabreira. By capacity it is the 66th largest of 234 operating wind plants in Portugal.

Owner
Finerge SA

Finerge SA [50%]; Guild Investments Ltd [50%]

Operator
Eólica da Cabreira
Coordinates
40.9832, -8.0449 (exact)
GEM plant ID
L100000910719

Plant details

How this wind plant is built and run.

Installation
Onshore

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Units

2 units at this site.

UnitCapacityStatusStartTechnology
1.0 20 MW Operating 2002Onshore
Expansion (small unit) 4.0 MW Operating 2002Onshore

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
35 GWh

Estimated · 2017

Capacity factor
16%

Output as a share of running at full power all year

Estimation method
Wind model
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — 71.57 34% WIND-V1
2014 — 54.54 26% WIND-V1
2015 — 24.78 12% WIND-V1
2016 — 37.54 18% WIND-V1
2017 — 34.56 16% WIND-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating wind plants.

In Portugal
66th

of 234 wind plants · see all

In Europe
2,697th

of 7,126

In the world
10,669th

of 17,121 · largest wind plants

Age
24 yrs

Country average for wind: 18 yrs

This plantCabril wind farm
24 MW
Average wind plantIn Portugal, across 234 plants
26 MW
Largest in PortugalVentominho wind farm
293 MW

About average for Portugal. About 8% of the size of the largest.

FAQ

About Cabril wind farm.

Who owns Cabril wind farm?

Its main owner is Finerge SA. It is operated by Eólica da Cabreira.

How big is Cabril wind farm?

It has 24 MW of operating capacity across 2 units. That makes it the 66th largest wind plant in Portugal and the 10,669th largest in the world.

Where is Cabril wind farm?

In Viseu, Portugal, at 40.9832, -8.0449.

When was Cabril wind farm built?

It started operating in 2002.

How much electricity does Cabril wind farm generate?

An estimated 35 GWh was generated in 2017, a capacity factor of 16%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1023311
  • GEM plant IDL100000910719
  • WEPP ID1053518
  • World Resources Institute plant IDWRI1023311

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.