- Operating capacity
- 124 MW
- Units
- 3
- Online since
- 2008
- Age
- 18 yrs
Toutiço wind farm is a 124 MW wind power plant in Coimbra, Portugal.
It has 3 units, which came online between 2008 and 2023. It is owned mainly by Finerge SA and operated by PEA - Parque Eólico da Serra Unipessoal. By capacity it is the 11th largest of 234 operating wind plants in Portugal.
- Owner
- Finerge SA
Finerge SA [100%]
- Operator
- PEA - Parque Eólico da Serra Unipessoal
- Coordinates
- 40.1718, -7.8336 (exact)
- GEM plant ID
- L100000911951
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
3 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| Vale Grande-Burrela | 21 MW | Operating | 2008 | Onshore |
| Arouca-Silva-Toita | 81 MW | Operating | 2009 | Onshore |
| Toutiço sobreq. | 22 MW | Operating | 2023 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 245 GWh
- Capacity factor
- 23%
- Estimation method
- Wind model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 263.88 | 24% | WIND-V1 |
| 2014 | — | 243.86 | 22% | WIND-V1 |
| 2015 | — | 234.71 | 22% | WIND-V1 |
| 2016 | — | 233.22 | 21% | WIND-V1 |
| 2017 | — | 245.06 | 23% | WIND-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating wind plants.
- In Europe
- 227th
- Age
- 18 yrs
of 7,126
Country average for wind: 18 yrs
4.7× the average wind plant in Portugal. About 42% of the size of the largest.
FAQ
About Toutiço wind farm.
Who owns Toutiço wind farm?
Its main owner is Finerge SA. It is operated by PEA - Parque Eólico da Serra Unipessoal.
How big is Toutiço wind farm?
It has 124 MW of operating capacity across 3 units. That makes it the 11th largest wind plant in Portugal and the 2,417th largest in the world.
Where is Toutiço wind farm?
In Coimbra, Portugal, at 40.1718, -7.8336.
When was Toutiço wind farm built?
Its first unit started in 2008 and its newest in 2023.
How much electricity does Toutiço wind farm generate?
An estimated 245 GWh was generated in 2017, a capacity factor of 23%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1022479
- GEM plant IDL100000911951
- World Resources Institute plant IDWRI1022479
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.