Banten Serang power station

CoalOperatingSupercritical

Salira · Pulo Ampel · Serang · Jawa · Indonesia

Operating capacity
660 MW
Units
2
Online since
2017
CO₂ a year
3.2 Mt

Banten Serang power station is a 660 MW coal power plant in Salira, Jawa, Indonesia.

It has 2 units, online since 2017. Its boilers are supercritical. It is owned mainly by PT Lestari Banten Energi. Traced to the top of the ownership chain, its largest owner is Genting Power Holdings (55%). Global Energy Monitor estimates it emits about 3.2 million tonnes of CO₂ a year. By capacity it is the 26th largest of 121 operating coal plants in Indonesia.

Owner
PT Lestari Banten Energi

PT Lestari Banten Energi [100%]

Parent company
Genting Power Holdings Ltd [55.0%]; SDIC Power Holdings Co Ltd [40.0%]; PT Hero Inti Pratama [5.0%]
Coordinates
-5.8830, 106.0459 (exact)
GEM plant ID
L100000102698

Plant details

How this coal plant is built and run.

Combustion technology
Supercritical
Coal source
Domestic

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
3.15 Mt

Million tonnes, operating units

CO₂ over remaining life
82 Mt

Up to 26 more years of operation

Capacity factor
64%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
41%

From a heat rate of 8,409 Btu/kWh

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2060in 34 years

No retirement date has been announced, so nothing yet ties the plant to Indonesia’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. Genting Power Holdings Companyowns 55% of PT Lestari Banten Energi
  2. PT Lestari Banten Energi Companyowns 100% of this plant

Ultimately owned by

No share traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

2 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 1 660 MW Operating 2017—Supercritical—3.15 Mt
Unit 2 660 MW Cancelled 2025—Supercritical——

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
3.6 TWh

Estimated · 2017

Capacity factor
62%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 3,591.70 62% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating coal plants.

In Indonesia
26th

of 121 coal plants · see all

In Asia
905th

of 1,872

In the world
1,127th

of 2,643 · largest coal plants

Age
9 yrs

Country average for coal: 13 yrs

This plantBanten Serang power station
660 MW
Average coal plantIn Indonesia, across 121 plants
518 MW
Largest in IndonesiaBanten Suralaya power station
6.0 GW

1.3× the average coal plant in Indonesia. About 11% of the size of the largest.

FAQ

About Banten Serang power station.

Who owns Banten Serang power station?

Its main owner is PT Lestari Banten Energi. Traced to the top of each ownership chain, its owners are Genting Power Holdings (55%), SDIC Power Holdings (40%) and PT Hero Inti Pratama (5%).

How big is Banten Serang power station?

It has 660 MW of operating capacity across 2 units. That makes it the 26th largest coal plant in Indonesia and the 1,127th largest in the world.

Where is Banten Serang power station?

In Salira, Pulo Ampel, Serang, Jawa, Indonesia, at -5.8830, 106.0459.

When was Banten Serang power station built?

It started operating in 2017.

How much CO₂ does Banten Serang power station emit?

Global Energy Monitor estimates about 3.2 million tonnes of CO₂ a year, and 82 million tonnes over the rest of its expected life.