Banten Lontar power station
Kemiri · Tangerang Regency · Jawa · Indonesia
- Operating capacity
- 1.3 GW
- Units
- 4
- Online since
- 2011
- CO₂ a year
- 7.2 Mt
Banten Lontar power station is a 1.3 GW coal power plant in Kemiri, Jawa, Indonesia.
It has 4 units, which came online between 2011 and 2024. Its boilers are subcritical. It is owned mainly by PT PLN (Persero). Traced to the top of the ownership chain, its largest owner is Government of Indonesia (100%). Global Energy Monitor estimates it emits about 7.2 million tonnes of CO₂ a year. By capacity it is the 14th largest of 121 operating coal plants in Indonesia.
- Owner
- PT PLN (Persero)
PT PLN (Persero) [100%]
- Parent company
- PT PLN (Persero) [100.0%]
- Coordinates
- -6.0589, 106.4643 (exact)
- GEM plant ID
- L100000102697
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical, ultra-supercritical
- Coal source
- Domestic
- Alternate fuel
- Bioenergy
- State ownership
- 100% · full state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 7.24 Mt
- CO₂ over remaining life
- 170 Mt
- Capacity factor
- 64%
- Efficiency
- 34%
Million tonnes, operating units
Up to 33 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 10,107 Btu/kWh
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to Indonesia’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- PT PLN (Persero) Company100%
Ownership chain
- Government of Indonesia Governmentowns 100% of PT PLN (Persero)
- PT PLN (Persero) Companyowns 100% of this plant
Ultimately owned by
- Government of Indonesia Government100%
At least 100% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
4 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 315 MW | Operating | 2011 | — | Subcritical | — | 1.87 Mt |
| Unit 2 | 315 MW | Operating | 2012 | — | Subcritical | — | 1.87 Mt |
| Unit 3 | 315 MW | Operating | 2012 | — | Subcritical | — | 1.87 Mt |
| Unit 4 | 315 MW | Operating | 2024 | — | Ultra-supercritical | — | 1.63 Mt |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 3.4 TWh
- Capacity factor
- 31%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 3,401.23 | 31% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating coal plants.
- In Asia
- 539th
- Age
- 15 yrs
of 1,872
Country average for coal: 13 yrs
2.4× the average coal plant in Indonesia. About 21% of the size of the largest.
FAQ
About Banten Lontar power station.
Who owns Banten Lontar power station?
Its main owner is PT PLN (Persero). Traced to the top of each ownership chain, its owners are Government of Indonesia (100%).
How big is Banten Lontar power station?
It has 1.3 GW of operating capacity across 4 units. That makes it the 14th largest coal plant in Indonesia and the 667th largest in the world.
Where is Banten Lontar power station?
In Kemiri, Tangerang Regency, Jawa, Indonesia, at -6.0589, 106.4643.
When was Banten Lontar power station built?
Its first unit started in 2011 and its newest in 2024.
How much CO₂ does Banten Lontar power station emit?
Global Energy Monitor estimates about 7.2 million tonnes of CO₂ a year, and 170 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1000914
- GEM plant IDL100000102697
- WEPP ID1026152
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.