CoalOperatingSubcritical, ultra-supercritical

Kemiri · Tangerang Regency · Jawa · Indonesia

Operating capacity
1.3 GW
Units
4
Online since
2011
CO₂ a year
7.2 Mt

Banten Lontar power station is a 1.3 GW coal power plant in Kemiri, Jawa, Indonesia.

It has 4 units, which came online between 2011 and 2024. Its boilers are subcritical. It is owned mainly by PT PLN (Persero). Traced to the top of the ownership chain, its largest owner is Government of Indonesia (100%). Global Energy Monitor estimates it emits about 7.2 million tonnes of CO₂ a year. By capacity it is the 14th largest of 121 operating coal plants in Indonesia.

Owner
PT PLN (Persero)

PT PLN (Persero) [100%]

Parent company
PT PLN (Persero) [100.0%]
Coordinates
-6.0589, 106.4643 (exact)
GEM plant ID
L100000102697

Plant details

How this coal plant is built and run.

Combustion technology
Subcritical, ultra-supercritical
Coal source
Domestic
Alternate fuel
Bioenergy
State ownership
100% · full state-owned enterprise

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
7.24 Mt

Million tonnes, operating units

CO₂ over remaining life
170 Mt

Up to 33 more years of operation

Capacity factor
64%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
34%

From a heat rate of 10,107 Btu/kWh

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2060in 34 years

No retirement date has been announced, so nothing yet ties the plant to Indonesia’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. Government of Indonesia Governmentowns 100% of PT PLN (Persero)
  2. PT PLN (Persero) Companyowns 100% of this plant

Ultimately owned by

At least 100% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

4 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 1 315 MW Operating 2011—Subcritical—1.87 Mt
Unit 2 315 MW Operating 2012—Subcritical—1.87 Mt
Unit 3 315 MW Operating 2012—Subcritical—1.87 Mt
Unit 4 315 MW Operating 2024—Ultra-supercritical—1.63 Mt

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
3.4 TWh

Estimated · 2017

Capacity factor
31%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 3,401.23 31% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating coal plants.

In Indonesia
14th

of 121 coal plants · see all

In Asia
539th

of 1,872

In the world
667th

of 2,643 · largest coal plants

Age
15 yrs

Country average for coal: 13 yrs

This plantBanten Lontar power station
1.3 GW
Average coal plantIn Indonesia, across 121 plants
518 MW
Largest in IndonesiaBanten Suralaya power station
6.0 GW

2.4× the average coal plant in Indonesia. About 21% of the size of the largest.

FAQ

About Banten Lontar power station.

Who owns Banten Lontar power station?

Its main owner is PT PLN (Persero). Traced to the top of each ownership chain, its owners are Government of Indonesia (100%).

How big is Banten Lontar power station?

It has 1.3 GW of operating capacity across 4 units. That makes it the 14th largest coal plant in Indonesia and the 667th largest in the world.

Where is Banten Lontar power station?

In Kemiri, Tangerang Regency, Jawa, Indonesia, at -6.0589, 106.4643.

When was Banten Lontar power station built?

Its first unit started in 2011 and its newest in 2024.

How much CO₂ does Banten Lontar power station emit?

Global Energy Monitor estimates about 7.2 million tonnes of CO₂ a year, and 170 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.