Companies / Company / United Kingdom
Vedanta Resources
Vedanta Resources Ltd
- Owned operating capacity
- 5.3 GW
- Operating plants
- 10
- In development
- 554 MW
- Countries
- 1
- Global rank
- #397
Vedanta Resources is recorded by Global Energy Monitor as a company headquartered in United Kingdom. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 5.3 GW at 10 plants in 1 country, ranking #397 of 13,356 owners on this site. All of it is coal. Its largest holding is Jharsuguda Sterlite power station in India, where its share of 52.6% equals 1.3 GW. The biggest part is held through Twin Star Holdings (about 2.8 GW). A further 554 MW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 13 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating5.3 GW80%
- Under construction316 MW5%
- Announced238 MW4%
- Mothballed84 MW1%
- Cancelled647 MW10%
Operating, by fuel
Operating, by country
Operating capacity by decade it started · average age 13 years
Map
10 operating plants with a stake held by Vedanta Resources.
Compared with peers
Largest company owners in United Kingdom, by owned operating capacity.
Ownership structure
Who owns Vedanta Resources, and what it owns.
Owned by
- Vedanta Company65.7%
- Volcan Investments Cyprus Company34.3%
Main chain to the top
- natural person(s) Individualsowns 100% of Vedanta
- Vedanta Companyowns 65.7% of Vedanta Resources
- Vedanta Resources Company
GEM’s designated parent: Vedanta (100%)
Owns 5 companies
- Twin Star Holdings 2.8 GW operating100%
- Vedanta Holdings Mauritius II 883 MW operating100%
- Hindustan Zinc 474 MW operating61.8%
- Konkola Copper Mines79.4%
- Vedanta Zinc International100%
Power plants
12 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| Jharsuguda Sterlite power stationOdisha · indirect | India | Coal | Operating | 52.6% | 1.3 GW | 2.4 GW |
| Jharsuguda CPP power stationOdisha | India | Coal | Operating | 100% | 1.2 GW | 1.2 GW |
| Talwandi Sabo Power ProjectPunjab · indirect | India | Coal | Operating | 52.6% | 1.0 GW | 2.0 GW |
| BALCO Korba power stationChhattisgarh · indirect | India | Coal | Operating | 26.8% | 539 MW | 2.0 GW |
| Meenakshi Energy Thermal Power ProjectAndhra Pradesh · indirect | India | Coal | Operating | 52.6% | 526 MW | 1.0 GW |
| Athena Chhattisgarh power stationChhattisgarh · indirect | India | Coal | Operating | 52.6% | 316 MW | 600 MW |
| Chanderiya Smelter power stationRajasthan · indirect | India | Coal | Operating | 61.8% | 145 MW | 234 MW |
| Rajpura Dariba Mine power stationRajasthan · indirect | India | Coal | Operating | 61.8% | 99 MW | 160 MW |
| Lanjigarh Refinery power stationOdisha | India | Coal | Operating | 100% | 90 MW | 90 MW |
| Zawar Mines power stationRajasthan · indirect | India | Coal | Operating | 61.8% | 49 MW | 80 MW |
| Vedanta Zambia power stationCopperbelt · indirect | Zambia | Coal | Announced | 79.4% | — | 300 MW planned |
| Tuticorin Smelter power stationTamil Nadu · indirect | India | Coal | Mothballed | 52.6% | — | 160 MW planned |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| Athena Chhattisgarh power stationUnit 2 | India | Coal | Under construction | 2027 | 316 MW | 600 MW |
| Vedanta Zambia power stationUnit 1 | Zambia | Coal | Announced | — | 119 MW | 150 MW |
| Vedanta Zambia power stationUnit 2 | Zambia | Coal | Announced | — | 119 MW | 150 MW |
Facts
- Name
- Vedanta Resources
- Full name
- Vedanta Resources Ltd
- Other names
- VEDANTA RESOURCES PLC [former]; ANGELCHANGE LIMITED [former]
- Type
- Company
- Legal form
- Ltd
- Publicly listed
- No
- Headquarters
- London, City of, United Kingdom
- Registered in
- United Kingdom
- Legal Entity Identifier
- 2138007MYEKPEAZQTW83
- PermID
- 4295893857
- UK Companies House
- 04740415
- GEM entity ID
- E100000121514
Questions
How much power plant capacity does Vedanta Resources own?
Weighted by its ownership share, Vedanta Resources owns 5.3 GW of operating coal, oil and gas and bioenergy capacity at 10 plants in 1 countries. A further 554 MW is in development and 0.0 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is Vedanta Resources’s largest power plant?
Jharsuguda Sterlite power station in India is its largest holding by owned operating capacity (1.3 GW, a 52.6% share).
Who owns Vedanta Resources?
Global Energy Monitor records 2 direct owners: Vedanta (65.7%); Volcan Investments Cyprus (34.3%).
Is Vedanta Resources building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 554 MW, including 316 MW under construction.
Which fuels do Vedanta Resources’s power plants use?
coal 100% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.