Companies / Company / United Kingdom
Burgundy Investments Holdings
Burgundy Investments Holdings LP
- Owned operating capacity
- 305 MW
- Operating plants
- 9
- In development
- 53 MW
- Countries
- 2
- Global rank
- #4,826
Burgundy Investments Holdings is recorded by Global Energy Monitor as a company headquartered in United Kingdom. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 305 MW at 9 plants in 2 countries, ranking #4,826 of 13,356 owners on this site. 60% of that is gas, followed by coal (40%). Its largest holding is Gavin Power Plant in United States, where its share of 4.8% equals 124 MW. The biggest part is held through Bridgepoint Group (about 305 MW). A further 53 MW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 32 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating305 MW74%
- Under construction2.9 MW0.7%
- Pre-construction40 MW10%
- Announced9.5 MW2%
- Mothballed24 MW6%
- Cancelled32 MW8%
Operating, by fuel
Operating, by country
Operating capacity by decade it started · average age 32 years
Map
9 operating plants with a stake held by Burgundy Investments Holdings.
Compared with peers
Largest company owners in United Kingdom, by owned operating capacity.
Ownership structure
Who owns Burgundy Investments Holdings, and what it owns.
Owned by
GEM records no owner above Burgundy Investments Holdings in this release, so it is treated as the top of its ownership chain.
Owns 1 company
- Bridgepoint Group 3.2 GW operating9.5%
Power plants
14 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| Gavin Power PlantOhio · indirect | United States | Coal | Operating | 4.8% | 124 MW | 2.6 GW |
| Lawrenceburg power stationIndiana · indirect | United States | Gas | Operating | 4.8% | 59 MW | 1.2 GW |
| Waterford power stationOhio · indirect | United States | Gas | Operating | 4.8% | 44 MW | 922 MW |
| Darby Power power stationOhio · indirect | United States | Gas | Operating | 4.8% | 27 MW | 564 MW |
| HO Clarke Generating power stationTexas · indirect | United States | Gas | Operating | 2.4% | 12 MW | 488 MW |
| Mark One power stationTexas · indirect | United States | Gas | Operating | 2.4% | 12 MW | 488 MW |
| Brotman power stationTexas · indirect | United States | Gas | Operating | 2.4% | 11 MW | 484 MW |
| Remy Jade power stationTexas · indirect | United States | Gas | Operating | 2.4% | 11 MW | 484 MW |
| Indian Queens power stationEngland · indirect | United Kingdom | Gas | Operating | 4.8% | 6.7 MW | 140 MW |
| Deeside power stationWales · indirect | United Kingdom | Gas | Under construction | 4.8% | — | 550 MW planned |
| Tyler Rose Generating Station 1 & 2Texas · indirect | United States | Gas | Pre-construction | 2.4% | — | 1.0 GW planned |
| Longleaf Generation StationTexas · indirect | United States | Gas | Pre-construction | 2.4% | — | 600 MW planned |
| Centre Village RIGS power stationNew Brunswick · indirect | Canada | Gas | Pre-construction | 2.4% | — | 500 MW planned |
| Protos Energy Recovery power stationEngland · indirect | United Kingdom | Waste | Under construction | 1.2% | — | 49 MW planned |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| Deeside power station2 | United Kingdom | Gas | Under construction | 2026 | 2.4 MW | 50 MW |
| Protos Energy Recovery power station1.0 | United Kingdom | Waste | Under construction | — | 0.6 MW | 49 MW |
| Longleaf Generation Station1 | United States | Gas | Pre-construction | 2029 | 14 MW | 600 MW |
| Tyler Rose Generating Station 1 & 2CT1-12 | United States | Gas | Pre-construction | 2029 | 14 MW | 600 MW |
| Centre Village RIGS power station1 | Canada | Gas | Pre-construction | 2028 | 12 MW | 500 MW |
| Tyler Rose Generating Station 1 & 22 | United States | Gas | Announced | 2029 | 9.5 MW | 400 MW |
Facts
- Name
- Burgundy Investments Holdings
- Full name
- Burgundy Investments Holdings LP
- Type
- Company
- Legal form
- LP
- Publicly listed
- No
- Headquarters
- United Kingdom
- Registered in
- United Kingdom
- Legal Entity Identifier
- not found
- PermID
- not found
- UK Companies House
- LP021848
- GEM entity ID
- E100002016385
Questions
How much power plant capacity does Burgundy Investments Holdings own?
Weighted by its ownership share, Burgundy Investments Holdings owns 305 MW of operating coal, oil and gas and bioenergy capacity at 9 plants in 2 countries. A further 53 MW is in development and 0.0 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is Burgundy Investments Holdings’s largest power plant?
Gavin Power Plant in United States is its largest holding by owned operating capacity (124 MW, a 4.8% share).
Who owns Burgundy Investments Holdings?
Global Energy Monitor records no owner above Burgundy Investments Holdings in this release.
Is Burgundy Investments Holdings building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 53 MW, including 2.9 MW under construction.
Which fuels do Burgundy Investments Holdings’s power plants use?
gas 60%, coal 40% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.