Companies / Company / Philippines
Beacon Electric Asset Holdings
Beacon Electric Asset Holdings Inc
- Owned operating capacity
- 622 MW
- Operating plants
- 7
- In development
- 683 MW
- Countries
- 2
- Global rank
- #3,342
Beacon Electric Asset Holdings is recorded by Global Energy Monitor as a company headquartered in Philippines. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 622 MW at 7 plants in 2 countries, ranking #3,342 of 13,356 owners on this site. 53% of that is gas, followed by coal (47%). Its largest holding is Batangas Combined Cycle power plant in Philippines, where its share of 14.1% equals 185 MW. The biggest part is held through Manila Electric (about 622 MW). A further 683 MW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 8 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating622 MW25%
- Under construction0.3 MW0.0%
- Pre-construction621 MW25%
- Announced62 MW2%
- Shelved557 MW23%
- Retired32 MW1%
- Cancelled575 MW23%
Operating, by fuel
Operating, by country
Operating capacity by decade it started · average age 8 years
Map
7 operating plants with a stake held by Beacon Electric Asset Holdings.
Compared with peers
Largest company owners in Philippines, by owned operating capacity.
Ownership structure
Who owns Beacon Electric Asset Holdings, and what it owns.
Owned by
- Metro Pacific Investments Company100%
Main chain to the top
- Metro Pacific Holdings Companyowns 55.6% of Metro Pacific Investments
- Metro Pacific Investments Companyowns 100% of Beacon Electric Asset Holdings
- Beacon Electric Asset Holdings Company
GEM’s designated parent: Mitsui & (20%), Metro Pacific Holdings (55.6%), GT Capital Holdings (15.6%)
Owns 1 company
- Manila Electric 1.8 GW operating35%
Power plants
12 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| Batangas Combined Cycle power plantCalabarzon · indirect | Philippines | Gas | Operating | 14.1% | 185 MW | 1.3 GW |
| Jurong Island power stationSouth West · indirect | Singapore | Gas | Operating | 15.5% | 144 MW | 930 MW |
| Panay power stationWestern Visayas · indirect | Philippines | Coal | Operating | 31.3% | 98 MW | 314 MW |
| Quezon power stationCalabarzon · indirect | Philippines | Coal | Operating | 8.8% | 94 MW | 1.1 GW |
| Cebu Energy power stationCentral Visayas · indirect | Philippines | Coal | Operating | 18.3% | 45 MW | 246 MW |
| Toledo City power stationCentral Visayas · indirect | Philippines | Coal | Operating | 35% | 29 MW | 82 MW |
| Kamanga power stationSoccsksargen · indirect | Philippines | Coal | Operating | 13.1% | 28 MW | 210 MW |
| Atimonan power stationCalabarzon · indirect | Philippines | Coal | Pre-construction | 35% | — | 2.6 GW planned |
| Subic power stationCentral Luzon · indirect | Philippines | Gas | Shelved | 16.5% | — | 660 MW planned |
| Jurong Island CC power stationSouth West · indirect | Singapore | Gas | Pre-construction | 15.5% | — | 670 MW planned |
| Zamboanga power stationZamboanga Peninsula · indirect | Philippines | Coal | Pre-construction | 17.5% | — | 120 MW planned |
| RExus power stationNorth West · indirect | Singapore | Biomass | Under construction | 2.3% | — | 13 MW planned |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| RExus power station-- | Singapore | Biomass | Under construction | 2026 | 0.3 MW | 13 MW |
| Atimonan power stationUnit 1 | Philippines | Coal | Pre-construction | 2030 | 234 MW | 668 MW |
| Atimonan power stationUnit 2 | Philippines | Coal | Pre-construction | 2030 | 234 MW | 668 MW |
| Jurong Island CC power station1 | Singapore | Gas | Pre-construction | 2029 | 104 MW | 670 MW |
| Toledo City power stationUnit 5 | Philippines | Coal | Pre-construction | 2029 | 29 MW | 82 MW |
| Zamboanga power station-- | Philippines | Coal | Pre-construction | 2028 | 21 MW | 120 MW |
| Batangas Combined Cycle power plant2-1 | Philippines | Gas | Announced | 2028 | 62 MW | 438 MW |
Facts
- Name
- Beacon Electric Asset Holdings
- Full name
- Beacon Electric Asset Holdings Inc
- Type
- Company
- Legal form
- Inc
- Publicly listed
- No
- Headquarters
- National Capital Région (Manila), Philippines
- Registered in
- Philippines
- Legal Entity Identifier
- not found
- PermID
- 5014439793
- GEM entity ID
- E100001000103
Questions
How much power plant capacity does Beacon Electric Asset Holdings own?
Weighted by its ownership share, Beacon Electric Asset Holdings owns 622 MW of operating coal, oil and gas and bioenergy capacity at 7 plants in 2 countries. A further 683 MW is in development and 32 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is Beacon Electric Asset Holdings’s largest power plant?
Batangas Combined Cycle power plant in Philippines is its largest holding by owned operating capacity (185 MW, a 14.1% share).
Who owns Beacon Electric Asset Holdings?
Global Energy Monitor records 1 direct owner: Metro Pacific Investments (100%).
Is Beacon Electric Asset Holdings building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 683 MW, including 0.3 MW under construction.
Which fuels do Beacon Electric Asset Holdings’s power plants use?
gas 53%, coal 47% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.