All plants / China / Shaanxi
Yulin Yuheng power station
华电陕西榆横煤电厂
Boluo Town · Hengshan · Yulin · Shaanxi · China
- Operating capacity
- 1.2 GW
- Units
- 2
- Online since
- 2013
- CO₂ a year
- 5.0 Mt
Yulin Yuheng power station is a 1.2 GW coal power plant in Boluo Town, Shaanxi, China.
It has 2 units, which came online between 2013 and 2014. Its boilers are ultra-supercritical. It is owned mainly by Shaanxi Huadian Yuheng Coal & Electricity Co Ltd. Traced to the top of the ownership chain, its largest owner is China Huadian (63%). Global Energy Monitor estimates it emits about 5.0 million tonnes of CO₂ a year. By capacity it is the 401st largest of 1,225 operating coal plants in China.
- Owner
- Shaanxi Huadian Yuheng Coal & Electricity Co Ltd
Shaanxi Huadian Yuheng Coal & Electricity Co Ltd [100%]
- Parent company
- China Huadian Corp Ltd [61.9%]; Yulin Investment Operation Group Co Ltd [16.0%]; unknown [12.6%]; Huadian Power International Co Ltd [9.4%]
- Coordinates
- 38.1347, 109.5368 (exact)
- GEM plant ID
- L100000101303
Plant details
How this coal plant is built and run.
- Combustion technology
- Ultra-supercritical
- Coal source
- Domestic · minemouth (next to the mine)
- Combined heat and power
- Yes
- Permit
- August 2012
- State ownership
- 16% · partial state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 5.04 Mt
- CO₂ over remaining life
- 113 Mt
- Capacity factor
- 52%
- Efficiency
- 37%
Million tonnes, operating units
Up to 23 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 9,099 Btu/kWh
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Shaanxi Huadian Yuheng Coal & Electricity Company100%
Ownership chain
- China Huadian Companyowns 78% of Huadian Coal Industry Group
- Huadian Coal Industry Group Companyowns 79.4% of Shaanxi Huadian Yuheng Coal & Electricity
- Shaanxi Huadian Yuheng Coal & Electricity Companyowns 100% of this plant
Ultimately owned by
- China Huadian Company63.4%
- State-owned Assets Supervision and Administration Commission of Yulin Municipal People's Government Government16%
- Huadian Power International Company9.4%
- Share not traceable8.1%
- People's Government of Yuyang District, Yulin City Government1.5%
- Yuling Mining Group Company1.5%
At least 17.5% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
2 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 600 MW | Operating | 2013 | — | Ultra-supercritical | — | 2.52 Mt |
| Unit 2 | 600 MW | Operating | 2014 | — | Ultra-supercritical | — | 2.52 Mt |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 5.8 TWh
- Capacity factor
- 56%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 5,847.22 | 56% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating coal plants.
- In Asia
- 565th
- Age
- 13 yrs
of 1,872
Country average for coal: 16 yrs
1.2× the average coal plant in China. About 17% of the size of the largest.
FAQ
About Yulin Yuheng power station.
Who owns Yulin Yuheng power station?
Its main owner is Shaanxi Huadian Yuheng Coal & Electricity Co Ltd. Traced to the top of each ownership chain, its owners are China Huadian (63%), State-owned Assets Supervision and Administration Commission of Yulin Municipal People's Government (16%), Huadian Power International (9%) and People's Government of Yuyang District, Yulin City (2%).
How big is Yulin Yuheng power station?
It has 1.2 GW of operating capacity across 2 units. That makes it the 401st largest coal plant in China and the 703rd largest in the world.
Where is Yulin Yuheng power station?
In Boluo Town, Hengshan, Yulin, Shaanxi, China, at 38.1347, 109.5368.
When was Yulin Yuheng power station built?
Its first unit started in 2013 and its newest in 2014.
How much CO₂ does Yulin Yuheng power station emit?
Global Energy Monitor estimates about 5.0 million tonnes of CO₂ a year, and 113 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1070497
- GEM plant IDL100000101303
- WEPP ID1081798
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.