- Operating capacity
- 6.0 MW
- Units
- 1
- Online since
- —
- Output a year
- 25 GWh
Yanling Shendu is a 6.0 MW hydropower plant in China.
By capacity it is the 1,488th largest of 1,580 operating hydropower plants in China.
- Owner
- —
- Commissioned
- —
- Coordinates
- 26.2500, 113.4700 (location from UNFCCC CDM Registry)
- GPPD ID
- WRI1070948
- Data source
- UNFCCC CDM Registry · via WRI Global Power Plant Database (2021). Not found in current Global Energy Monitor trackers.
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 25 GWh
- Capacity factor
- 47%
- Estimation method
- Hydro model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 19.00 | 36% | HYDRO-V1 |
| 2014 | — | 24.30 | 46% | HYDRO-V1 |
| 2015 | — | 22.74 | 43% | HYDRO-V1 |
| 2016 | — | 24.90 | 47% | HYDRO-V1 |
| 2017 | — | 24.53 | 47% | HYDRO-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating hydropower plants.
2% of the average hydropower plant in China. About 0% of the size of the largest.
FAQ
About Yanling Shendu.
How big is Yanling Shendu?
It has 6.0 MW of operating capacity. That makes it the 1,488th largest hydropower plant in China and the 7,161st largest in the world.
Where is Yanling Shendu?
In China, at 26.2500, 113.4700.
How much electricity does Yanling Shendu generate?
An estimated 25 GWh was generated in 2017, a capacity factor of 47%, according to the WRI Global Power Plant Database.
What kind of power plant is Yanling Shendu?
It is a hydropower plant.
Is Yanling Shendu still operating?
Yes. 6.0 MW is in operation.
Sources and identifiers
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1070948
- GPPD IDWRI1070948
- WEPP ID1074509
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.