Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Japan

Yamagawa Binary geothermal power plant

GeothermalOperatingBinary cycle

Japan

Operating capacity
5.0 MW
Units
1
Online since
2018
Age
8 yrs

Yamagawa Binary geothermal power plant is a 5.0 MW geothermal power plant in Japan.

It has been operating since 2018. It is owned mainly by Kyuden Mirai Energy Co Inc and operated by Kyuden Mirai Energy. By capacity it is the 20th largest of 28 operating geothermal plants in Japan.

Operator
Kyuden Mirai Energy
Coordinates
31.1906, 130.6137 (approximate)
GEM plant ID
L100001042969

Plant details

How this geothermal plant is built and run.

Technology
Binary cycle

Electricity output

How much power this plant produces.

WRI Global Power Plant Database, 2013–2019.

ReportedEstimated
Latest annual output
135 GWh

Estimated · 2017

Capacity factor
309%

Output as a share of running at full power all year

Estimation method
CAPACITY-FACTOR-V1
Show data table
YearReported (GWh)Estimated (GWh)Capacity factorMethod
2013 — — — NO-ESTIMATION
2014 — — — NO-ESTIMATION
2015 — — — NO-ESTIMATION
2016 — — — NO-ESTIMATION
2017 — 135.13 309% CAPACITY-FACTOR-V1
2018 — — — —
2019 — — — —

How it compares

Size among operating geothermal plants.

In Japan
20th

of 28 geothermal plants · see all

In Asia
95th

of 111

In the world
266th

of 304 · largest geothermal plants

Age
8 yrs

Country average for geothermal: 23 yrs

This plantYamagawa Binary geothermal power plant
5.0 MW
Average geothermal plantIn Japan, across 28 plants
23 MW
112 MW

21% of the average geothermal plant in Japan. About 4% of the size of the largest.

FAQ

About Yamagawa Binary geothermal power plant.

Who owns Yamagawa Binary geothermal power plant?

Its main owner is Kyuden Mirai Energy Co Inc. It is operated by Kyuden Mirai Energy.

How big is Yamagawa Binary geothermal power plant?

It has 5.0 MW of operating capacity. That makes it the 20th largest geothermal plant in Japan and the 266th largest in the world.

Where is Yamagawa Binary geothermal power plant?

In Japan, at 31.1906, 130.6137.

When was Yamagawa Binary geothermal power plant built?

It started operating in 2018.

How much electricity does Yamagawa Binary geothermal power plant generate?

An estimated 135 GWh was generated in 2017, a capacity factor of 309%, according to the WRI Global Power Plant Database.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Geothermal Power Tracker (2026-03) · GEM Wiki page
  • Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1020128
  • GEM plant IDL100001042969
  • WEPP ID1043354

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.