- Operating capacity
- 5.0 MW
- Units
- 1
- Online since
- 2018
- Age
- 8 yrs
Yamagawa Binary geothermal power plant is a 5.0 MW geothermal power plant in Japan.
It has been operating since 2018. It is owned mainly by Kyuden Mirai Energy Co Inc and operated by Kyuden Mirai Energy. By capacity it is the 20th largest of 28 operating geothermal plants in Japan.
- Operator
- Kyuden Mirai Energy
- Coordinates
- 31.1906, 130.6137 (approximate)
- GEM plant ID
- L100001042969
Plant details
How this geothermal plant is built and run.
- Technology
- Binary cycle
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 135 GWh
- Capacity factor
- 309%
- Estimation method
- CAPACITY-FACTOR-V1
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 135.13 | 309% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating geothermal plants.
- In Asia
- 95th
- Age
- 8 yrs
of 111
Country average for geothermal: 23 yrs
21% of the average geothermal plant in Japan. About 4% of the size of the largest.
FAQ
About Yamagawa Binary geothermal power plant.
Who owns Yamagawa Binary geothermal power plant?
Its main owner is Kyuden Mirai Energy Co Inc. It is operated by Kyuden Mirai Energy.
How big is Yamagawa Binary geothermal power plant?
It has 5.0 MW of operating capacity. That makes it the 20th largest geothermal plant in Japan and the 266th largest in the world.
Where is Yamagawa Binary geothermal power plant?
In Japan, at 31.1906, 130.6137.
When was Yamagawa Binary geothermal power plant built?
It started operating in 2018.
How much electricity does Yamagawa Binary geothermal power plant generate?
An estimated 135 GWh was generated in 2017, a capacity factor of 309%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Geothermal Power Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1020128
- GEM plant IDL100001042969
- WEPP ID1043354
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.