Xinjiang Wushi (Huaneng) 700 MW solar power plant

华能乌什700兆瓦光储一体化项目

SolarOperatingPV

Aheya Town solar park · Uqturpan (Wushi) · Aksu Prefecture · Xinjiang · China

Operating capacity
700 MW
Units
2
Online since
2023
Age
3 yrs

Xinjiang Wushi (Huaneng) 700 MW solar power plant is a 700 MW solar power plant in Aheya Town solar park, Xinjiang, China.

It has 2 units, online since 2023. It is owned mainly by Huaneng Xinjiang Energy Development Co Ltd. By capacity it is the 100th largest of 13,289 operating solar plants in China.

Owner
Huaneng Xinjiang Energy Development Co Ltd

Huaneng Xinjiang Energy Development Co Ltd [100%]

Coordinates
41.2110, 79.7080 (approximate)
GEM plant ID
L100000811465

Plant details

How this solar plant is built and run.

Technology
PV
Capacity rating
MWac (grid-connection AC capacity)

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Units

2 units at this site.

UnitCapacityStatusStartTechnology
1 450 MW Operating 2023PV
2 250 MW Operating 2023PV

How it compares

Size among operating solar plants.

In China
100th

of 13,289 solar plants · see all

In Asia
123rd

of 36,916

In the world
133rd

of 79,372 · largest solar plants

Age
3 yrs

Country average for solar: 8 yrs

This plantXinjiang Wushi (Huaneng) 700 MW solar power plant
700 MW
Average solar plantIn China, across 13,289 plants
48 MW

15× the average solar plant in China. About 18% of the size of the largest.

FAQ

About Xinjiang Wushi (Huaneng) 700 MW solar power plant.

Who owns Xinjiang Wushi (Huaneng) 700 MW solar power plant?

Its main owner is Huaneng Xinjiang Energy Development Co Ltd.

How big is Xinjiang Wushi (Huaneng) 700 MW solar power plant?

It has 700 MW of operating capacity across 2 units. That makes it the 100th largest solar plant in China and the 133rd largest in the world.

Where is Xinjiang Wushi (Huaneng) 700 MW solar power plant?

In Aheya Town solar park, Uqturpan (Wushi), Aksu Prefecture, Xinjiang, China, at 41.2110, 79.7080.

When was Xinjiang Wushi (Huaneng) 700 MW solar power plant built?

It started operating in 2023.

What kind of power plant is Xinjiang Wushi (Huaneng) 700 MW solar power plant?

It is a solar power plant using PV technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100000811465

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.