All plants / China / Xinjiang
Xinjiang Usu power station
乌苏市生活垃圾焚烧发电项目
Usu City · Tacheng Prefecture · Xinjiang · China
- Operating capacity
- 15 MW
- Units
- 1
- Online since
- 2025
- Age
- 1 yrs
Xinjiang Usu power station is a 15 MW waste-to-energy plant in Usu City, Xinjiang, China.
It has been operating since 2025. It is owned mainly by Hubei Tianyuan Environmental Protection Group Co Ltd and operated by Usu Baoyun Environmental Protection Power. Traced to the top of the ownership chain, its largest owner is Hubei Tianyuan Environmental Protection Group (100%). By capacity it is the 447th largest of 764 operating waste-to-energy plants in China.
- Owner
- Hubei Tianyuan Environmental Protection Group Co Ltd
Hubei Tianyuan Environmental Protection Group Co Ltd [100%]
- Parent company
- Hubei Tianyuan Environmental Protection Group Co Ltd [100.0%]
- Operator
- Usu Baoyun Environmental Protection Power
- Coordinates
- 44.3348, 84.3011 (approximate)
- GEM plant ID
- L100001046550
Plant details
How this waste-to-energy plant is built and run.
- Fuel
- Refuse (municipal and industrial wastes)
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Hubei Tianyuan Environmental Protection Group Company100%
Ultimately owned by
- Hubei Tianyuan Environmental Protection Group Company100%
No share traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
How it compares
Size among operating waste-to-energy plants.
- In Asia
- 525th
- Age
- 1 yrs
of 874
Country average for waste-to-energy: 7 yrs
52% of the average waste-to-energy plant in China. About 5% of the size of the largest.
FAQ
About Xinjiang Usu power station.
Who owns Xinjiang Usu power station?
Its main owner is Hubei Tianyuan Environmental Protection Group Co Ltd. Traced to the top of each ownership chain, its owners are Hubei Tianyuan Environmental Protection Group (100%). It is operated by Usu Baoyun Environmental Protection Power.
How big is Xinjiang Usu power station?
It has 15 MW of operating capacity. That makes it the 447th largest waste-to-energy plant in China and the 787th largest in the world.
Where is Xinjiang Usu power station?
In Usu City, Tacheng Prefecture, Xinjiang, China, at 44.3348, 84.3011.
When was Xinjiang Usu power station built?
It started operating in 2025.
What kind of power plant is Xinjiang Usu power station?
It is a waste-to-energy plant, fuelled by refuse (municipal and industrial wastes).
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Bioenergy Power Tracker (2026-10) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100001046550
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.