All plants / China / Xinjiang
Xinjiang Gurbantünggüt Desert Renewables Base Mori solar farms
古尔班通古特沙漠基地项目(华电木垒25万千瓦光伏部分)
Mori · Changji AP · Xinjiang · China
- Operating capacity
- 500 MW
- Units
- 3
- Online since
- 2025
- Age
- 1 yrs
Xinjiang Gurbantünggüt Desert Renewables Base Mori solar farms is a 500 MW solar power plant in Mori, Xinjiang, China.
It has 3 units, online since 2025. It is owned mainly by Changji Gurbantünggüt Desert Base New Energy Development CO LTD Huadian Mori Branch CO Co Ltd. By capacity it is the 140th largest of 13,289 operating solar plants in China.
- Coordinates
- 44.2530, 90.2480 (approximate)
- GEM plant ID
- L100000828958
Plant details
How this solar plant is built and run.
- Technology
- PV
- Capacity rating
- MWac (grid-connection AC capacity)
- Battery storage on site
- Yes
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
3 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| China Coal | 125 MW | Operating | 2025 | PV |
| Huadian | 250 MW | Operating | 2025 | PV |
| Shaanxi Investment | 125 MW | Operating | 2025 | PV |
How it compares
Size among operating solar plants.
- In Asia
- 179th
- Age
- 1 yrs
of 36,916
Country average for solar: 8 yrs
11× the average solar plant in China. About 13% of the size of the largest.
FAQ
About Xinjiang Gurbantünggüt Desert Renewables Base Mori solar farms.
Who owns Xinjiang Gurbantünggüt Desert Renewables Base Mori solar farms?
Its main owner is Changji Gurbantünggüt Desert Base New Energy Development CO LTD Huadian Mori Branch CO Co Ltd.
How big is Xinjiang Gurbantünggüt Desert Renewables Base Mori solar farms?
It has 500 MW of operating capacity across 3 units. That makes it the 140th largest solar plant in China and the 219th largest in the world.
Where is Xinjiang Gurbantünggüt Desert Renewables Base Mori solar farms?
In Mori, Changji AP, Xinjiang, China, at 44.2530, 90.2480.
When was Xinjiang Gurbantünggüt Desert Renewables Base Mori solar farms built?
It started operating in 2025.
What kind of power plant is Xinjiang Gurbantünggüt Desert Renewables Base Mori solar farms?
It is a solar power plant using PV technology.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
- GEM plant IDL100000828958
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.