All plants / China / Xinjiang
Xiaoshankou Stage 2 hydroelectric plant
小山口二级水电站
Hejing · Bayingolin AP · Xinjiang · China
- Operating capacity
- 50 MW
- Units
- 1
- Online since
- 2013
- Age
- 13 yrs
Xiaoshankou Stage 2 hydroelectric plant is a 50 MW hydropower plant in Hejing, Xinjiang, China.
It has been operating since 2013. It is a run-of-river plant on the Kaidu River. It is owned mainly by Xinjiang Bazhou Xinhua Hydropower Development CO LTD. By capacity it is the 747th largest of 1,580 operating hydropower plants in China.
- Coordinates
- 42.2071, 85.9040 (exact)
- GEM plant ID
- L100001045452
Plant details
How this hydropower plant is built and run.
- Type
- Run-of-river
- River
- Kaidu River
- Turbines
- 3 x 16.5 MW
How it compares
Size among operating hydropower plants.
- In Asia
- 1,466th
- Age
- 13 yrs
of 2,179
Country average for hydropower: 21 yrs
19% of the average hydropower plant in China. About 0% of the size of the largest.
FAQ
About Xiaoshankou Stage 2 hydroelectric plant.
Who owns Xiaoshankou Stage 2 hydroelectric plant?
Its main owner is Xinjiang Bazhou Xinhua Hydropower Development CO LTD.
How big is Xiaoshankou Stage 2 hydroelectric plant?
It has 50 MW of operating capacity. That makes it the 747th largest hydropower plant in China and the 3,617th largest in the world.
Where is Xiaoshankou Stage 2 hydroelectric plant?
In Hejing, Bayingolin AP, Xinjiang, China, at 42.2071, 85.9040.
When was Xiaoshankou Stage 2 hydroelectric plant built?
It started operating in 2013.
Which river is Xiaoshankou Stage 2 hydroelectric plant on?
The Kaidu River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- GEM plant IDL100001045452
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.