All plants / United States / South Carolina
Winyah Generating Station
Georgetown · South Carolina · United States
- Operating capacity
- 1.3 GW
- Units
- 6
- Online since
- 1975
- CO₂ a year
- 5.8 Mt
Winyah Generating Station is a 1.3 GW coal power plant in Georgetown, South Carolina, United States.
It has 6 units, which came online between 1975 and 1981. Its boilers are subcritical, burning bituminous coal. It is owned mainly by South Carolina Public Service Authority. Traced to the top of the ownership chain, its largest owner is State of South Carolina (100%). Global Energy Monitor estimates it emits about 5.8 million tonnes of CO₂ a year. By capacity it is the 64th largest of 212 operating coal plants in the United States. Its last operating unit is due to retire in 2035.
- Owner
- South Carolina Public Service Authority
South Carolina Public Service Authority [100%]
- Parent company
- South Carolina Public Service Authority [100.0%]
- In development
- 107 MW (from 2027)
- Coordinates
- 33.3295, -79.3577 (exact)
- GEM plant ID
- L100000104182
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical
- Coal type
- Bituminous
- Coal source
- Domestic
- State ownership
- 100% · full state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 5.82 Mt
- CO₂ over remaining life
- 52 Mt
- Capacity factor
- 45%
- Efficiency
- 29%
Million tonnes, operating units
Up to 9 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 11,748 Btu/kWh
Retirement and national pledges
- Planned retirement
- 2035in 9 years
- Coal phase-out pledge
- 2035in 9 years
- Net-zero target
- 2050in 24 years
The planned retirement matches the United States’ coal phase-out date. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- South Carolina Public Service Authority State body100%
Ownership chain
- State of South Carolina Governmentowns 100% of South Carolina Public Service Authority
- South Carolina Public Service Authority State bodyowns 100% of this plant
Ultimately owned by
- State of South Carolina Government100%
At least 100% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
6 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 315 MW | Operating | 1975 | 2035 planned | Subcritical | Bituminous | 1.46 Mt |
| Unit 2 | 315 MW | Operating | 1977 | 2035 planned | Subcritical | Bituminous | 1.46 Mt |
| Unit 3 | 315 MW | Operating | 1980 | 2035 planned | Subcritical | Bituminous | 1.46 Mt |
| Unit 4 | 315 MW | Operating | 1981 | 2035 planned | Subcritical | Bituminous | 1.46 Mt |
| CT 1 | 54 MW | Pre-construction | 2027 | — | Gas turbine | Fossil gas: natural gas, fossil liquids: fuel oil | — |
| CT 2 | 54 MW | Pre-construction | 2027 | — | Gas turbine | Fossil gas: natural gas, fossil liquids: fuel oil | — |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 712 GWh
- Capacity factor
- 6%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 1,289.11 | — | 12% | NO-ESTIMATION |
| 2014 | 4,690.24 | — | 42% | NO-ESTIMATION |
| 2015 | 3,910.60 | — | 35% | NO-ESTIMATION |
| 2016 | 0.00 | — | 0% | NO-ESTIMATION |
| 2017 | 1,214.02 | 5,820.16 | 11% | CAPACITY-FACTOR-V1 |
| 2018 | 0.00 | — | 0% | — |
| 2019 | 712.31 | — | 6% | — |
How it compares
Size among operating coal plants.
- Age
- 51 yrs
Country average for coal: 45 yrs
1.5× the average coal plant in the United States. About 32% of the size of the largest.
FAQ
About Winyah Generating Station.
Who owns Winyah Generating Station?
Its main owner is South Carolina Public Service Authority. Traced to the top of each ownership chain, its owners are State of South Carolina (100%).
How big is Winyah Generating Station?
It has 1.3 GW of operating capacity across 6 units. That makes it the 64th largest coal plant in the United States and the 667th largest in the world.
Where is Winyah Generating Station?
In Georgetown, South Carolina, United States, at 33.3295, -79.3577.
When was Winyah Generating Station built?
Its first unit started in 1975 and its newest in 1981.
How much CO₂ does Winyah Generating Station emit?
Global Energy Monitor estimates about 5.8 million tonnes of CO₂ a year, and 52 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0006249
- GEM plant IDL100000104182
- WEPP ID33012
- EIA plant ID6249
- EIP plant IDcb3ea00d-ef7b-49c6-86cc-18707c0ad3d2
- EIA unit ID5
- EIA unit ID6
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.