- Operating capacity
- 1.0 MW
- Units
- 1
- Online since
- 1985
- Output a year
- 2.6 GWh
Weissenegg is a 1.0 MW hydropower plant in Austria.
It is owned mainly by Verbund. By capacity it is the 131st largest of 136 operating hydropower plants in Austria.
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 2.6 GWh
- Capacity factor
- 30%
- Estimation method
- Hydro model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 2.31 | 26% | HYDRO-V1 |
| 2014 | — | 3.20 | 37% | HYDRO-V1 |
| 2015 | — | 2.61 | 30% | HYDRO-V1 |
| 2016 | — | 2.62 | 30% | HYDRO-V1 |
| 2017 | — | 2.61 | 30% | HYDRO-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating hydropower plants.
1% of the average hydropower plant in Austria. About 0% of the size of the largest.
FAQ
About Weissenegg.
Who owns Weissenegg?
Its main owner is Verbund.
How big is Weissenegg?
It has 1.0 MW of operating capacity. That makes it the 131st largest hydropower plant in Austria and the 8,969th largest in the world.
Where is Weissenegg?
In Austria, at 46.8167, 15.8667.
When was Weissenegg built?
It started operating in 1985.
How much electricity does Weissenegg generate?
An estimated 2.6 GWh was generated in 2017, a capacity factor of 30%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1005264
- GPPD IDWRI1005264
- WEPP ID1034937
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.