Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / Indonesia / Maluku

Weda Bay power station

CoalOperatingSupercritical

Weda · Maluku · Indonesia

Operating capacity
4.5 GW
Units
14
Online since
2020
CO₂ a year
24.6 Mt

Weda Bay power station is a 4.5 GW coal power plant in Weda, Maluku, Indonesia.

It has 14 units, which came online between 2020 and 2025. Its boilers are supercritical. It is owned mainly by PT Angel Nickel Industry. Traced to the top of the ownership chain, its largest owner is Zhejiang Huayou Holding Group (15%). Global Energy Monitor estimates it emits about 24.6 million tonnes of CO₂ a year. By capacity it is the 3rd largest of 121 operating coal plants in Indonesia.

Owner
PT Angel Nickel Industry

PT Angel Nickel Industry [100%]

Parent company
Nickel Industries Ltd [80.0%]
Coordinates
0.4764, 128.0013 (exact)
GEM plant ID
L100000104613

Plant details

How this coal plant is built and run.

Combustion technology
Supercritical
Coal source
Domestic
Captive plant
Supplies nickel industry (power)

Climate

Carbon dioxide from this plant, as estimated by Global Energy Monitor.

CO₂ a year
24.59 Mt

Million tonnes, operating units

CO₂ over remaining life
774 Mt

Up to 34 more years of operation

Capacity factor
64%

Country average GEM assumes for its coal fleet, not this plant's own figure

Efficiency
36%

From a heat rate of 9,528 Btu/kWh

Retirement and national pledges

Planned retirement
Not announced
Coal phase-out pledge
None recorded
Net-zero target
2060in 34 years

No retirement date has been announced, so nothing yet ties the plant to Indonesia’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.

Timeline

When each unit started, retired, or is planned to retire.

  • Operating
  • Retired
  • In development
  • Until planned retirement

Who owns it

Direct owners, and the owners at the top of each chain, as a share of operating capacity.

Direct owners

Ownership chain

  1. natural person(s) Individualsowns 40.3% of TSINGSHAN Holding Group
  2. TSINGSHAN Holding Group Companyowns 46% of PT Indonesia Weda Bay Industrial Park
  3. PT Indonesia Weda Bay Industrial Park Companyowns 41.9% of this plant

Ultimately owned by

At least 1.7% traced to a government or state body.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.

Units

14 units at this site.

UnitCapacityStatusStartRetired / plannedTechnologyCoalCO₂ a year
Unit 1 250 MW Operating 2020—Supercritical—1.43 Mt
Unit 2 250 MW Operating 2020—Supercritical—1.43 Mt
Unit 3 250 MW Operating 2021—Supercritical—1.43 Mt
Unit 4 250 MW Operating 2021—Supercritical—1.43 Mt
Unit 5 250 MW Operating 2022—Supercritical—1.43 Mt
Unit 6 250 MW Operating 2022—Supercritical—1.43 Mt
Unit 7 380 MW Operating 2022—Supercritical—2.00 Mt
Unit 8 380 MW Operating 2022—Supercritical—2.00 Mt
Unit 10 380 MW Operating 2023—Supercritical—2.00 Mt
Unit 11 380 MW Operating 2023—Supercritical—2.00 Mt
Unit 9 380 MW Operating 2023—Supercritical—2.00 Mt
Unit 12 380 MW Operating 2024—Supercritical—2.00 Mt
Unit 13 380 MW Operating 2024—Supercritical—2.00 Mt
Unit 14 380 MW Operating 2025—Supercritical—2.00 Mt

How it compares

Size among operating coal plants.

In Indonesia
3rd

of 121 coal plants · see all

In Asia
26th

of 1,872

In the world
29th

of 2,643 · largest coal plants

Age
6 yrs

Country average for coal: 13 yrs

This plantWeda Bay power station
4.5 GW
Average coal plantIn Indonesia, across 121 plants
518 MW
Largest in IndonesiaBanten Suralaya power station
6.0 GW

8.8× the average coal plant in Indonesia. About 75% of the size of the largest.

FAQ

About Weda Bay power station.

Who owns Weda Bay power station?

Its main owner is PT Angel Nickel Industry. Traced to the top of each ownership chain, its owners are Zhejiang Huayou Holding Group (15%), Nickel Industries (13%), Zhejiang Huayou Cobalt (6%) and Walsin Lihwa (4%).

How big is Weda Bay power station?

It has 4.5 GW of operating capacity across 14 units. That makes it the 3rd largest coal plant in Indonesia and the 29th largest in the world.

Where is Weda Bay power station?

In Weda, Maluku, Indonesia, at 0.4764, 128.0013.

When was Weda Bay power station built?

Its first unit started in 2020 and its newest in 2025.

How much CO₂ does Weda Bay power station emit?

Global Energy Monitor estimates about 24.6 million tonnes of CO₂ a year, and 774 million tonnes over the rest of its expected life.

Sources and identifiers

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.