- Operating capacity
- 660 MW
- Units
- 9
- Online since
- 1981
- CO₂ a year
- 2.5 Mt
Turceni power station is a 660 MW coal power plant in Turceni, Gorj, Romania.
It has 9 units, which came online between 1976 and 1989. Its boilers are subcritical, burning lignite coal. It is owned mainly by Complexul Energetic Oltenia SA. Traced to the top of the ownership chain, its largest owner is Government of Romania (78%). Global Energy Monitor estimates it emits about 2.5 million tonnes of CO₂ a year. By capacity it is the 2nd largest of 5 operating coal plants in Romania. Its last operating unit is due to retire in 2029.
- Owner
- Complexul Energetic Oltenia SA
Complexul Energetic Oltenia SA [100%]
- Parent company
- Ministry of Energy (Romania) [77.2%]; Fondul Proprietatea SA [21.6%]
- In development
- 475 MW
- Retired
- 1.7 GW (last in 2025)
- Coordinates
- 44.6697, 23.4078 (exact)
- GEM plant ID
- L100000103296
Plant details
How this coal plant is built and run.
- Combustion technology
- Subcritical
- Coal type
- Lignite
- Coal source
- Domestic
- Coal supply notes
- Jilț Coal Mine, Tehomir underground mine
- State ownership
- 78% · partial state-owned enterprise
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 2.46 Mt
- CO₂ over remaining life
- 5 Mt
- Capacity factor
- 34%
- Efficiency
- 29%
Million tonnes, operating units
Up to 3 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 11,748 Btu/kWh
Retirement and national pledges
- Planned retirement
- 2029in 3 years
- Coal phase-out pledge
- 2032in 6 years
- Net-zero target
- 2050in 24 years
The planned retirement comes 3 years before Romania’s coal phase-out date. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Complexul Energetic Oltenia Company100%
Ownership chain
- Government of Romania Governmentowns 100% of Ministry of Energy (Romania)
- Ministry of Energy (Romania) State bodyowns 77.2% of Complexul Energetic Oltenia
- Complexul Energetic Oltenia Companyowns 100% of this plant
Ultimately owned by
- Government of Romania Government78.5%
- small shareholder(s) Unidentified owners17.9%
- NN Group Company2.4%
- Share not traceable1.2%
At least 78.5% traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
9 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 330 MW | Retired | 1976 | 2019 | Subcritical | Lignite | — |
| Unit 2 | 330 MW | Retired | 1979 | 2019 | Subcritical | Lignite | — |
| Unit 4 | 330 MW | Operating | 1981 | 2026 planned | Subcritical | Lignite | 1.23 Mt |
| Unit 5 | 330 MW | Operating | 1983 | 2029 planned | Subcritical | Lignite | 1.23 Mt |
| Unit 6 | 330 MW | Retired | 1985 | 2006 | Subcritical | Lignite | — |
| Unit 7 | 330 MW | Retired | 1987 | 2025 | Subcritical | Lignite | — |
| Unit 3 | 330 MW | Retired | 1989 | 2021 | Subcritical | Lignite | — |
| 5 | 475 MW | Pre-construction | — | — | Combined cycle | Fossil gas: natural gas | — |
| New Unit 6 | 330 MW | Cancelled | — | — | Subcritical | Lignite | — |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 4.5 TWh
- Capacity factor
- 78%
- Reported by
- JRC-PPDB-OPEN
Reported · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | 4,317.60 | — | 75% | NO-ESTIMATION |
| 2016 | 4,019.70 | — | 70% | NO-ESTIMATION |
| 2017 | 4,526.10 | 4,045.09 | 78% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating coal plants.
- In Europe
- 64th
- Age
- 45 yrs
of 197
Country average for coal: 49 yrs
1.4× the average coal plant in Romania. About 67% of the size of the largest.
FAQ
About Turceni power station.
Who owns Turceni power station?
Its main owner is Complexul Energetic Oltenia SA. Traced to the top of each ownership chain, its owners are Government of Romania (78%) and NN Group (2%).
How big is Turceni power station?
It has 660 MW of operating capacity across 9 units. That makes it the 2nd largest coal plant in Romania and the 1,127th largest in the world.
Where is Turceni power station?
In Turceni, Gorj, Romania, at 44.6697, 23.4078.
When was Turceni power station built?
Its first unit started in 1976 and its newest in 1989.
How much CO₂ does Turceni power station emit?
Global Energy Monitor estimates about 2.5 million tonnes of CO₂ a year, and 5 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1023225
- GEM plant IDL100000103296
- WEPP ID1027288
- Beyond Fossil Fuels plant IDRO-24
- Beyond Fossil Fuels unit IDRO-24-1
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.