All plants / Spain / Castilla y León
Teso Pardo wind farm
Valverde de Campos · Valladolid · Castilla y León · Spain
- Operating capacity
- 36 MW
- Units
- 1
- Online since
- 2019
- Age
- 7 yrs
Teso Pardo wind farm is a 36 MW wind power plant in Valverde de Campos, Castilla y León, Spain.
It has been operating since 2019. It is owned mainly by Naturgy Energy Group SA and operated by Naturgy Energy Group. By capacity it is the 363rd largest of 939 operating wind plants in Spain.
- Owner
- Naturgy Energy Group SA
Naturgy Energy Group SA [100%]
- Operator
- Naturgy Energy Group
- Coordinates
- 41.8001, -5.0101 (approximate)
- GEM plant ID
- L100000913946
Plant details
How this wind plant is built and run.
- Installation
- Onshore
How it compares
Size among operating wind plants.
- In Europe
- 1,584th
- Age
- 7 yrs
of 7,126
Country average for wind: 18 yrs
About average for Spain. About 8% of the size of the largest.
FAQ
About Teso Pardo wind farm.
Who owns Teso Pardo wind farm?
Its main owner is Naturgy Energy Group SA. It is operated by Naturgy Energy Group.
How big is Teso Pardo wind farm?
It has 36 MW of operating capacity. That makes it the 363rd largest wind plant in Spain and the 8,718th largest in the world.
Where is Teso Pardo wind farm?
In Valverde de Campos, Valladolid, Castilla y León, Spain, at 41.8001, -5.0101.
When was Teso Pardo wind farm built?
It started operating in 2019.
What kind of power plant is Teso Pardo wind farm?
It is a wind power plant using Onshore technology.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- GEM plant IDL100000913946
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.