Temerin Municipality South Backa Administrative District solar project

SolarOperatingAssumed PV

Temerin Municipality · South Backa Administrative District · Vojvodina · Serbia

Operating capacity
8.3 MW
Units
1
Online since
2023
Age
3 yrs

Temerin Municipality South Backa Administrative District solar project is an 8.3 MW solar power plant in Temerin Municipality, Vojvodina, Serbia.

It has been operating since 2023. By capacity it is the 10th largest of 37 operating solar plants in Serbia.

Owner
—
Coordinates
45.3870, 19.8702 (exact)
GEM plant ID
L100001005454

Plant details

How this solar plant is built and run.

Technology
Assumed PV
Capacity rating
MWac (grid-connection AC capacity)

How it compares

Size among operating solar plants.

In Serbia
10th

of 37 solar plants · see all

In Europe
4,006th

of 28,467

In the world
17,705th

of 79,372 · largest solar plants

Age
3 yrs

Country average for solar: 3 yrs

This plantTemerin Municipality South Backa Administrative District solar project
8.3 MW
Average solar plantIn Serbia, across 37 plants
5.4 MW
Largest in SerbiaAda solar farm
27 MW

1.5× the average solar plant in Serbia. About 31% of the size of the largest.

FAQ

About Temerin Municipality South Backa Administrative District solar project.

How big is Temerin Municipality South Backa Administrative District solar project?

It has 8.3 MW of operating capacity. That makes it the 10th largest solar plant in Serbia and the 17,705th largest in the world.

Where is Temerin Municipality South Backa Administrative District solar project?

In Temerin Municipality, South Backa Administrative District, Vojvodina, Serbia, at 45.3870, 19.8702.

When was Temerin Municipality South Backa Administrative District solar project built?

It started operating in 2023.

What kind of power plant is Temerin Municipality South Backa Administrative District solar project?

It is a solar power plant using Assumed PV technology.

Is Temerin Municipality South Backa Administrative District solar project still operating?

Yes. 8.3 MW is in operation.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100001005454
  • OpenStreetMap unit ID1297330195
  • TZ unit ID278707
  • TZ unit ID904401
  • TZ unit ID1196381
  • TZ unit ID1264900
  • TZ unit ID1309812

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.